Operations Day -- 335/1998 (1 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 335/1998 (December 1, 1998)
	Mission Day -- 464
	Orbit Number -- 98335

	Pass Highlights:  station:  DSS-16      AOS: 15:46      LOS: 19:10


	Pass Summary: Nominal recorder dump, SEPICA commanding from OCR
SEP-040B.


	Anomalies: (See anomaly report #G98-0243) Commanding delayed for
approximately 11 min. at AOS.

	Activities:
15:50:00	BOT
16:04:42	SSR-B  placed in RECORD Operate Mode
16:05:28	SSR-A  placed in PLAYBACK Operate Mode
16:07:38	Time Tag bins loaded for LOS
16:21:40	S/C commanded to SCIENCE Downlink Format
16:39:46	SEPICA commanding started
16:58:30	SEPICA commanding complete
18:51:00	SSR  playback completed
18:59:31	S/C commanded to ADC Downlink Format
19:00:00	Poke commands issued to Active and Inactive C&DH
19:03:04	Time Tag bins loaded for next day AOS time
19:10:00	EOT

BACK
Operations Day -- 336/1998 (2 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 336/1998 (Dec 2, 1998)
	Mission Day -- 465
	Orbit Number -- 98336

	Pass Highlights:  station:  DSS-66      AOS: 12:35        LOS15:40


	Pass Summary: Nominal recorder dump.

	Anomalies: (see anomaly report #G98-0244)
	Voice loop non-functional for entire pass. Used black phones for
all communications.

	Activities:
12:40:00	BOT
12:49:19	SSR  placed in RECORD Operate Mode
12:50:05	SSR  placed in PLAYBACK Operate Mode
12:52:53	Time Tag bins loaded for LOS
13:06:27	S/C commanded to SCIENCE Downlink Format
14:57:14	SSR  playback completed
15:18:11	S/C commanded to ADC Downlink Format
15:19:00	Poke commands issued to Active and Inactive C&DH
15:21:00	Time Tag bins loaded for next day AOS time
15:40:00	EOT

BACK
Operations Day -- 337/1998 (3 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 337/1998 (Dec 3, 1998)
	Mission Day -- 466
	Orbit Number -- 98337

	Pass Highlights:  station:  DSS-54      AOS               LOS

	                                      14:03:13         15:00:00

	Pass Summary:
	  Test pass with Madrid's D54.  Initially unable to lock up on the
spacecraft's receivers, but after corrective action taken all was well.
Successfully tested commanding, telemetry, tape recorder dump.

	Anomalies:
	     * G98-0245 - D54 was using a sweep range of 30 kHz, while ACE
now uses one of 60 kHz.  After correcting this discrepancy, site was able
to lock on the Spacecraft's receivers.

	Activities:
14:00:00	BOT
14:23:38	SSR A placed in RECORD Operate Mode
14:24:24	SSR B placed in PLAYBACK Operate Mode
14:25:44	Time Tag bins loaded for LOS
14:35:21	S/C commanded to SCIENCE Downlink Format
14:48:03	S/C commanded to ADC Downlink Format
14:49:04	Poke commands issued to Active and Inactive C&DH
14:51:44	Time Tag bins loaded for next day AOS time
14:55:23	SSR  A put in Idle Operate Mode
15:00:00	EOT

BACK
Operations Day -- 337/1998 (3 Dec 98) -- addendum
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 337/1998 (Dec 3, 1998)
	Mission Day -- 466
	Orbit Number -- 98337

	Pass Highlights:  Station      AOS                 LOS
	                    D24     16:22:09            19:55:00

	Pass Summary:
	Nominal pass with no anomalies.  The dumping of SSR A was continued
from the point at which it had been stopped during the day's earlier pass
on D54.  SSR B was left in Record Operate Mode.
	Attitude maneuver successfully performed today leaving ACE with a
HGA angle of 3.9 degrees.

	Activities:
16:25:00	BOT
16:29:57	SSR A placed in PLAYBACK Operate Mode
16:31:25	Time Tag bins loaded for LOS
16:33:30	Catbeds Powered ON
17:48:46	Maneuver Started
17:52:27	Maneuver Completed
17:59:13	Catbeds Powered OFF
18:05:52	S/C commanded to SCIENCE Downlink Format
19:30:11	S/C commanded to ADC Downlink Format
19:31:15	Poke commands issued to Active and Inactive C&DH
19:33:23	Time Tag bins loaded for next day AOS time
19:55:00	EOT

BACK
Operations Day -- 338/1998 (4 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 338/1998 (December 4, 1998)
	Mission Day -- 467
	Orbit Number -- 98338

	Pass Highlights:  station:  DSS-66     AOS: 12:41:47     LOS:
15:45:00

	Pass Summary: Nominal recorder dump. Performed weekly SWEPAM
calibrations.

	Anomalies: NONE

	Activities:
12:40:00	BOT
12:51:24	SSR-A  placed in RECORD Operate Mode
12:52:09	SSR-B  placed in PLAYBACK Operate Mode
12:53:23	Time Tag bins loaded for LOS
13:03:01	S/C commanded to SCIENCE Downlink Format
13:05:00	Performed weekly SWEPAM calibrations
15:05:00	SSR  playback completed
15:17:06	S/C commanded to ADC Downlink Format
15:18:00	Poke commands issued to Active and Inactive C&DH
15:20:10	Time Tag bins loaded for next day AOS time
15:45:00	EOT

BACK
Operations Day -- 339/1998 (5 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 339/1998 (Dec 5, 1998)
	Mission Day -- 469
	Orbit Number -- 98339

	Pass Highlights:  station:  DSS-61      AOS                   LOS

	                                       130521              160413

	Pass Summary:
	Support ended prematurely due to masking at site. Timetag bin
comparison was not completed. Poke commands were not sent at the end of
day, and timetag bins were not loaded for automatic data rate change for
next days AOS.
	The console team nofitied the Ops Supervisor. Upon verifying the
s/c status before support was terminated, and verifying that the LOS
timetag bin had been loaded earlier in the pass to change the data rate to
RTSW format at EOT, the station was released.
	Both NOAA and AFSCN operation centers were contacted in regards to
the ~.5 hour data loss. Preparations were made to next days pass plan to
manually switch data rates.

	Anomalies:
	     *  G98-0288 - DR #L02761  -   Although ACE had set at 16:02:27
at Station D61, the pass had been  scheduled to end at 1630.  The error was
not caught by either ACE scheduling, DSN scheduling, or the station.

	Activities:
13:00:00	BOT w/ DSS 61
13:08:06	SSR B placed in RECORD Operate Mode
13:08:54	SSR A placed in PLAYBACK Operate Mode
13:10:02	Time Tag bins loaded for LOS
13:18:03	S/C commanded to SCIENCE Downlink Format
15:38:07	SSR  playback completed
16:02:27	Set at Station D61
16:30:00	EOT w/ DSS 61

BACK
Operations Day -- 340/1998 (6 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 340/1998 (December 6, 1998)
	Mission Day -- 470
	Orbit Number -- 98340

	Pass Highlights:  station:  DSS-27     AOS: 16:49:00     LOS:19:55:00


	Pass Summary: Nominal recorder dump. Completely recovered from the
previous day's shortcoming covered by anomaly report G98-0247.

	Anomalies: (see anomaly report G98-0248) At precal, station
reported that antenna experienced a high level break release and would not
move. BOT was scheduled for 16:25, but did not occur until 16:49. No
adverse impact experienced.


	Activities:
16:49:00	AOS
16:59:04	SSR-A  placed in RECORD Operate Mode
17:00:11	SSR-B  placed in PLAYBACK Operate Mode
17:01:38	Time Tag bins loaded for LOS
17:11:00	S/C commanded to SCIENCE Downlink Format
19:29:39	S/C commanded to ADC Downlink Format
19:30:00	Poke commands issued to Active and Inactive C&DH
19:32:32	Time Tag bins loaded for next day AOS time
19:50:00	SSR  playback completed
19:55:00	EOT

BACK
Operations Day -- 341/1998 (7 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 341/1998 (December 7, 1998)
	Mission Day -- 470
	Orbit Number -- 98341

	Pass Highlights:  station: DSS-66     AOS = 12:35:27     LOS =
15:45:00


	Pass Summary:
	Nominal Support with SSR playback

	Anomalies:
	None

	Activities:
12:40:00	BOT w/ DSS 66
12:43:16	SSR B placed in RECORD Operate Mode
12:44:01	SSR A placed in PLAYBACK Operate Mode
12:45:24	Time Tag bins loaded for LOS
13:02:19	S/C commanded to SCIENCE Downlink Format
14:45:41	SSR A playback completed
15:09:35	S/C commanded to ADC Downlink Format
15:11:06	Poke commands issued to Active and Inactive C&DH
15:13:27	Time Tag bins loaded for next day AOS time
15:45:00	EOT w/ DSS 66

BACK
Operations Day -- 342/1998 (8 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 342/1998 (December 8, 1998)
	Mission Day -- 471
	Orbit Number -- 98342

	Support Team:

	Pass Highlights:  station: DSS-61    AOS = 13:01:26    LOS =
15:50:00
	                  station: DSS-27    AOS = 16:06:13    LOS = 16:50:00

	Pass Summary:
	Two DSN supports scheduled due to potential impact from SPC-60
downtime (IP transition).  All command and Playback operations were
achieved in first DSN support with Madrid DSS 61.   Second support was used
for 498 RTSW format telemetry monitoring only.

	Anomalies:
	None.

	Activities:
13:00:00	BOT w/ DSS 61
13:14:24	SSR A placed in RECORD Operate Mode
13:15:12	SSR B placed in PLAYBACK Operate Mode
13:17:45	Time Tag bins loaded for LOS for Second Support LOS
13:29:47	S/C commanded to SCIENCE Downlink Format
15:27:00	S/C commanded to ADC Downlink Format
15:27:13	Poke commands issued to Active and Inactive C&DH
15:29:28	Time Tag bins loaded for next day AOS time
15:37:35	Time Tag bin reloaded for first support LOS - Overwrite of
Time tag load for Second support
15:45:10	SSR B playback completed
15:50:00	EOT w/ DSS 61
15:53:00	Precal activity w/DSS27
16:05:00	BOT w/ DSS 27
16:06:13	AOS at 498 bps (RTSW format)
16:24:24	NO_OP command issued for command verification
16:50:00	EOT w DSS 27

BACK
Operations Day -- 343/1998 (9 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 343/1998 (December 9 , 1998)
	Mission Day -- 472
	Orbit Number -- 98343

	Pass Highlights:  Station     AOS = 12:36:48     LOS = 15:55:00
	                  DSS-66

	Pass Summary:
	 - Executed Attitude Maneuver which required 2 parts
Pre Manuever:
Sun Angle  =  5.64 deg       HGA = -3.73       Spin Rate = 4.9337
Post Manuever:
Sun Angle (part 1)  =  6.50   HGA (part 1)  =  1.5
Sun Angle (part 2)  =  9.93   HGA  (part 2)  = 4.1  Spin Rate = 4.935
	 - Experienced Station Transmitter problems - Power Amp Failure -
Station switch over to bypass mode (16 watt uplink power)

	Anomalies:
	 - G98-0249  -  Power Amp Failure at Station D66 antenna  (DR # L02776)

	Activities:
12:40:00	BOT
12:41:10	SSR B  placed in RECORD Operate Mode
12:41:57	SSR A placed in PLAYBACK Operate Mode
12:43:19	Time Tag bins loaded for LOS
12:46:13	Radial Catbeds Powered ON
14:12:20	1 of 2 Attitude Maneuvers Started - 20 pulses (~4 min 5 sec
manuever)
14:16:10	Maneuver Completed
14:29:00	Power Amp failure at D66 - uplink pwr 16 watts (bypass mode)
15:08:30	2 of 2 Attitude Maneuver Started  - 15 pulses ( ~3 min 3
sec maneuver)
15:11:33	Manuever Completed
15:13:29	Catbeds Powered OFF
15:26:01	SSR A playback completed
15:27:55	S/C commanded to SCIENCE Downlink Format - Limited SCIENCE
telem monitoring only
15:36:28	S/C commanded to ADC Downlink Format
15:36:31	Poke commands issued to Active and Inactive C&DH
15:39:14	Time Tag bins loaded for next day AOS time
15:55:00	EOT

BACK
Operations Day -- 344/1998 (10 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 344/1998 (December 10, 1998)
	Mission Day -- 473
	Orbit Number -- 98344

	Pass Highlights:  station: DSS-66     AOS = 12:35:43     LOS =
16:00:00

	Pass Summary:
	TPOCC packet extractor crash during SSR playback.   All data was
recovered.

	Anomalies:
	G98-0250 - TPOCC packet extractor crash.

	Activities:
12:40:00	BOT w/ DSS 66
12:42:19	SSR A placed in RECORD Operate Mode
12:43:28	SSR B placed in PLAYBACK Operate Mode
12:44:34	Time Tag bins loaded for LOS
13:02:57	S/C commanded to SCIENCE Downlink Format
13:19:00	TPOCC Packet Extractor Crash -  Software recycled
13:27:00	TPOCC system back on-line
15:26:55	SSR B playback completed
15:35:55	S/C commanded to ADC Downlink Format
15:36:26	Poke commands issued to Active and Inactive C&DH
15:42:59	Time Tag bins loaded for next day AOS time
16:00:00	EOT w/ DSS 66

BACK
Operations Day -- 345/1998 (11 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 345/1998 (December 11, 1998)
	Mission Day -- 474
	Orbit Number -- 98345

	Pass Highlights: station: DSS-66     AOS = 12:35:09     LOS =
16:00:00

	Pass Summary:
	Nominal Support  w/ weekly SWEPAM calibrations.

	Anomalies:
	None.

	Activities:
12:40:00	BOT w/ DSS 66
12:43:32	SSR B placed in RECORD Operate Mode
12:44:20	SSR  A placed in PLAYBACK Operate Mode
12:45:26	Time Tag bins loaded for LOS
12:50:19	S/C commanded to SCIENCE Downlink Format
15:11:37	SSR A playback completed
15:37:15	S/C commanded to ADC Downlink Format
15:37:53	Poke commands issued to Active and Inactive C&DH
15:40:37	Time Tag bins loaded for next day AOS time
16:00:00	EOT w/ DSS 66

BACK
Operations Day -- 346/1998 (12 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 346/1998 (December 12, 1998)
	Mission Day -- 475
	Orbit Number -- 98346

	Pass Highlights:  station: DSS-66     AOS = 12:36:58     LOS =
16:05:00

	Pass Summary:
	Ground Station Anomaly with D66 -  Transmitter power supply
problems (1500-15:18).  Finished all end of Day configurations with 16 watt
uplink (bypass mode) from station D66.  Problem was resolved and uplink was
reconfigured for nominal 2kw.

	Anomalies:
	G98-0251 - Tranmitter power supply problem at D66  - Ref DR# L02785

	Activities:
12:40:00	BOT w/ DSS
12:39:47	SSR A placed in RECORD Operate Mode
12:40:33	SSR B  placed in PLAYBACK Operate Mode
12:41:48	Time Tag bins loaded for LOS
12:54:34	S/C commanded to SCIENCE Downlink Format
15:01:00	Ground Station Anamoly (Transmitter Power Supply Failure -
uplink set to 16 watts (bypass mode))
15:18:36	SSR B playback completed
15:28:59	S/C commanded to ADC Downlink Format
15:29:18	Poke commands issued to Active and Inactive C&DH
15:31:35	Time Tag bins loaded for next day AOS time
15:35:00	Ground Station Anomaly resolved (Uplink set back to nominal
2kw)
16:05:00	EOT w/ DSS

BACK
Operations Day -- 347/1998 (13 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 347/1998 (December 13, 1998)
	Mission Day -- 477
	Orbit Number -- 98347

	Pass Highlights: station:  DSS-27      AOS                 LOS

	                                     16:22:26            19:55:00

	Pass Summary:
	Nominal pass w/ D27 (No ranging or doppler).

	Anomalies:
	     *  None

	Activities:
16:25:00	BOT w/ DSS 27
16:27:41	SSR B placed in RECORD Operate Mode
16:28:25	SSR A placed in PLAYBACK Operate Mode
16:29:34	Time Tag bins loaded for LOS
16:39:44	S/C commanded to SCIENCE Downlink Format
16:33:30	ADS program run
19:33:41	SSR A Redumps completed
19:40:16	S/C commanded to ADC Downlink Format
19:42:19	Poke commands issued to Active and Inactive C&DH
19:43:28	Time Tag bins loaded for next day AOS time
19:55:00	EOT w/ DSS 27

BACK
Operations Day -- 348/1998 (14 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 348/1998 (December 14, 1998)
	Mission Day -- 477
	Orbit Number -- 98348

	Pass Highlights:  station:  DSS-66     AOS: 1236     LOS: 1540

	Pass Summary:   Routine pass with recorder playback

	Anomalies:  None

	Activities:
12:40:00	BOT w/ DSS66
12:43:43	SSR A placed in RECORD Operate Mode
12:44:32	SSR B placed in PLAYBACK Operate Mode
12:46:01	Time Tag bins loaded for LOS
12:52:53	S/C commanded to SCIENCE Downlink Format
14:48:00	SSR  playback completed
15:25:22	S/C commanded to ADC Downlink Format
15:26:00	Poke commands issued to Active and Inactive C&DH
15:28:34	Time Tag bins loaded for next day AOS time
15:40:00	EOT w/ DSS66

BACK
Operations Day -- 349/1998 (15 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 349/1998 (Dec. 15, 1998)
	Mission Day -- 479
	Orbit Number -- 98349

	Pass Highlights:  Station      AOS  18:30:22                 LOS 22:05
	                  DSS-27

	Pass Summary: A dog-leg maneuver performed -nominal- And a IMOC
packet extractor crash.

	Anomalies: AR G98-0252  21:19Z, A packet extractor failure
occurred. Had to replay slices 635-661 of SSRA, all data was recovered
(6.5min.).

	Activities:
18:35:00	BOT
18:38:05	SSR  placed in RECORD Operate Mode
18:38:52	SSR  placed in PLAYBACK Operate Mode
18:40:15	Time Tag bins loaded for LOS
18:42:55	Catbeds Powered ON
19:57:14	Maneuver Started, 2nd maneuver start time 20:42:27
20:00:43	Maneuver Completed, 2nd maneuver complete time 20:46:04
20:48:59	Catbeds Powered OFF
20:58:51	S/C commanded to SCIENCE Downlink Format
21:54:56	S/C commanded to ADC Downlink Format
21:55:57	Poke commands issued to Active and Inactive C&DH
21:58:09	Time Tag bins loaded for next day AOS time
22:05:00	EOT

BACK
Operations Day -- 350/1998 (16 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 350/1998 (December 16, 1998)
	Mission Day -- 479
	Orbit Number -- 98350

	Pass Highlights:  station:  DSS-61      AOS  12:57:58     LOS  16:20

	Pass Summary:   Routine pass with recorder dump.  SEPICA lost gas
pressure in Fan 3, meaning that no SEPICA data is available until the patch
procedure is carried out.
	This problem was detected too late in the pass to carry out the
patch today.

	Anomalies:  None.

	Activities:
13:00:00	BOT w/ DSS61
13:04:53	SSR A placed in RECORD Operate Mode
13:05:40	SSR B placed in PLAYBACK Operate Mode
13:07:57	Time Tag bins loaded for LOS
13:21:32	S/C commanded to SCIENCE Downlink Format
14:58:34	SSR  playback completed
16:05:14	S/C commanded to ADC Downlink Format
16:05:36	Poke commands issued to Active and Inactive C&DH
16:07:48	Time Tag bins loaded for next day AOS time
16:20:00	EOT w/ DSS61

BACK
Operations Day -- 351/1998 (17 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 351/1998 (Dec. 17, 1998)
	Mission Day -- 480
	Orbit Number -- 98351

	Pass Highlights:  station:  DSS-61     AOS  13:23:08     LOS
16:25:00

	Pass Summary: Sepica fans 2 and 3 closed causing both counters to
empty. OCR SEP-043 executed to maintain pressure in fans 2 and 3 with patch
regulation.
	An Operations Directive (OPD) was issued by the NOPE in conjunction
with FDF. OPD-ACE-013 requires the stations to alter Precal COMP and Range
COMP parameters which should resolve some  ambiguity in the range data.

	Anomalies:None

	Activities:
13:25:00	BOT w/ DSS
13:29:31	SSR  placed in RECORD Operate Mode
13:30:19	SSR  placed in PLAYBACK Operate Mode
13:31:34	Time Tag bins loaded for LOS
13:42:42	S/C commanded to SCIENCE Downlink Format
14:05:32	Execute OCR SEP-043 (completed at 15:44:34)
16:00:27	SSR  playback completed
16:05:22	S/C commanded to ADC Downlink Format
16:06:17	Poke commands issued to Active and Inactive C&DH
16:08:39	Time Tag bins loaded for next day AOS time
16:25:00	EOT w/ DSS

BACK
Operations Day -- 352/1998 (18 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 352/1998 (December 18, 1998)
	Mission Day -- 481
	Orbit Number -- 98352

	Pass Highlights:  station:  DSS-24      AOS  16:56:00     LOS  20:25:00


	Pass Summary: Performed weekly SWEPAM calibration procedures.
	Following the calibration OCR SWPX-007 was executed to modify the
normal operating cycle of SWEPAM-E.  The execution of the OCR interruped
the calibration in progress on-board and the weekly calibration was
repeated.
	The instrument team detected an anomaly with the instrument.  The
OCR only patched one of the required memory locations.  This caused the
instrument to branch to an unspecified data format.
	The instrumenter requested an emergency in order to command
SWEPAM-E into a safe mode in order to prevent any damage to the instrument
if it was not shut down immediately.


	Anomalies:  The memory poke put SWEPAM-E in an unknown state (see
AR #S98-0022).  SWEPAM-E engineers saw that it was not returning valid data
and declared an emergency.  ACE FOT began steps to recycle the SWEPAM-E
DPU.
	The processor was halted and will be repowered tomorrow, after
further analysis (OCR SWPX-008).

	Activities:
16:55:00	BOT w/ DSS24
16:59:01	SSR A placed in RECORD Operate Mode
17:00:02	SSR B placed in PLAYBACK Operate Mode
17:01:18	Time Tag bins loaded for LOS
17:21:14	S/C commanded to SCIENCE Downlink Format
17:22:31	SWEPAM weekly calibrations
17:25:00	SWEPAM-E memory poke - OCR SWPX-007
17:38:00	SWEPAM-E calibration repeated
19:06:00	SWEPAM-E commanded to Standby DPU state
19:45:00	SWEPAM-E recovery procedure begun (OCR SWPX-008, first two
steps)
19:47:00	SSR  playback completed
20:09:05	S/C commanded to ADC Downlink Format
20:09:58	Poke commands issued to Active and Inactive C&DH
20:12:05	Time Tag bins loaded for next day AOS time
20:25:00	EOT w/ DSS24


BACK
Operations Day -- 353/1998 (19 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 353/1998 (Dec. 19, 1998)
	Mission Day -- 482
	Orbit Number -- 98353

	Pass Highlights:  station:  DSS-66      AOS                   LOS



	Pass Summary:
	Executed OCR SWPX-008 to return SWEPAM to a normal operating mode.

	Anomalies:   Packet extractor crashed 1402z - 1411z.  Had to
playback slices 267-288.  Commanding to SWEPAM was delayed


	Activities:
12:50:00	BOT w/ DSS
12:52:51	SSR  placed in RECORD Operate Mode
12:53:25	SSR  placed in PLAYBACK Operate Mode
12:54:35	Time Tag bins loaded for LOS
13:06:56	S/C commanded to SCIENCE Downlink Format
14:56:00	SSR  playback completed
16:05:06	S/C commanded to ADC Downlink Format
16:05:57	Poke commands issued to Active and Inactive C&DH
16:08:50	Time Tag bins loaded for next day AOS time
16:20:00	EOT w/ DSS

	Note:  Schedule commercial power outage for weekend started at
1200z saturday



BACK
Operations Day -- 354/1998 (20 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 354/1998 (Dec. 20, 1998)
	Mission Day -- 482
	Orbit Number -- 98354

	Pass Highlights:  station:  DSS-66      AOS      1246
LOS    1620


	Pass Summary:
	Routine pass with recorder dump.  Scheduled commercial power outage
for FOT started at 1200z saturday and continued all day today (no effect on
MOC workstations)

	Anomalies:   None


	Activities:
12:50:00	BOT w/ DSS66
12:53:52	SSR A placed in RECORD Operate Mode
12:54:42	SSR B placed in PLAYBACK Operate Mode
12:55:59	Time Tag bins loaded for LOS
13:11:25	S/C commanded to SCIENCE Downlink Format
15:20:30	SSR  playback completed
16:10:02	S/C commanded to ADC Downlink Format
16:05:57	Poke commands issued to Active and Inactive C&DH
16:13:00	Time Tag bins loaded for next day AOS time
16:20:00	EOT w/ DSS66


BACK
Operations Day -- 355/1998 (21 Dec 98)

	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 355/1998 (Dec 21, 1998)
	Mission Day -- 484
	Orbit Number -- 98355

	Pass Highlights:  station:  DSS-66      AOS: 13:00       LOS: 16:25



	Pass Summary: Nominal SSR dump.


	Anomalies: (See anomaly report #G98-0253) Poke command issued to
inactive C&DH via the TSTOL proc
	G_INITIAL_CONTACT was not accepted by the s/c. Had station swap
CPA's. This cleared the problem.

	Activities:
13:00:00	BOT
13:11:10	SSR-B  placed in RECORD Operate Mode
13:11:57	SSR-A  placed in PLAYBACK Operate Mode
13:13:21	Time Tag bins loaded for LOS
13:26:19	S/C commanded to SCIENCE Downlink Format
15:40:00	SSR  playback completed
16:00:00	S/C commanded to ADC Downlink Format
16:01:00	Poke commands issued to Active and Inactive C&DH
16:04:11	Time Tag bins loaded for next day AOS time
16:25:00	EOT


BACK
Operations Day -- 356/1998 (22 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 356/1998 (December 22, 1998)
	Mission Day -- 485
	Orbit Number -- 98356

	Pass Highlights:  Station      AOS: 16:55       LOS: 20:53
	                                  DSS-16


	Pass Summary: Nominal Recorder dump. Two attitude maneuvers.
Emergency commanding to
	SEPICA

	Anomalies: Emergency commanding to SEPICA covered under OCR SEP-044
(see anomaly report
	#S98-0023).  The instrument team believes that the telemetry
indicates that Fan 2 may be broken.  The commanding set the Fan 3 pressure
to zero so that the S3DPU will stop opening the remaining Fan 3 valve every
3 minutes.
	This action puts Fan 3 in a safe condition until the intrument team
can thoroughly review the housekeeping data

	Activities:
16:55:00	BOT
17:04:07	SSR-A  placed in RECORD Operate Mode
17:05:14	SSR-B  placed in PLAYBACK Operate Mode
17:07:03	Time Tag bins loaded for LOS
17:09:41	Catbeds Powered ON
18:49:55	Maneuver 1 Started
18:54:24	Maneuver 1 Completed
19:38:34	Maneuver 2 Started
19:43:11	Maneuver 2 Completed
20:02:38	Catbeds Powered OFF
20:11:08	S/C commanded to ADC Downlink Format
20:12:12	Poke commands issued to Active and Inactive C&DH
20:14:30	Time Tag bins loaded for next day AOS time
20:31:56	S/C commanded to SCIENCE Downlink Format
20:53:00	EOT

BACK
Operations Day -- 357/1998 (23 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 357/1998 (Dec 23, 1998)
	Mission Day -- 486
	Orbit Number -- 98357

	Pass Highlights:  station:  DSS-66      AOS: 12:55      LOS: 16:25



	Pass Summary: Nominal recorder dump, SEPICA commanding from OCR's
SEP-045 and SEP-046.   These OCR's performed test to the F2 and F1 fill
valves.
	Uploaded an S3DPU patch covered by OCR S3D-003.  This patch changes
the scheme used by the S3DPU to identify which detector is being triggered

	Anomalies: NONE


	Activities:
12:55:00	BOT
12:58:33	SSR-B  placed in RECORD Operate Mode
12:59:21	SSR-A  placed in PLAYBACK Operate Mode
13:00:35	Time Tag bins loaded for LOS
13:07:39	S/C commanded to SCIENCE Downlink Format
13:47:06	S3DPU commanding started
13:58:08	S3DPU commanding complete
13:59:54	SEPICA commanding started
15:01:00	SSR  playback completed
15:30:45	SEPICA commanding complete
16:06:10	S/C commanded to ADC Downlink Format
16:07:00	Poke commands issued to Active and Inactive C&DH
16:09:32	Time Tag bins loaded for next day AOS time
16:25:00	EOT



BACK
Operations Day -- 358/1998 (24 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 358/1998 (Dec 24, 1998)
	Mission Day -- 487
	Orbit Number -- 98358

	Pass Highlights:  station:  DSS-66      AOS: 12:50           LOS:
16:15


	Pass Summary: Nominal Recorder dump. Ran DPS.


	Anomalies: NONE


	Activities:
12:50:00	BOT
12:54:12	SSR-B  placed in RECORD Operate Mode
12:54:59	SSR-A  placed in PLAYBACK Operate Mode
12:56:34	Time Tag bins loaded for LOS
13:11:26	S/C commanded to SCIENCE Downlink Format
15:21:00	SSR  playback completed
15:49:38	S/C commanded to ADC Downlink Format
15:50:00	Poke commands issued to Active and Inactive C&DH
15:53:18	Time Tag bins loaded for next day AOS time
16:15:00	EOT


BACK
Operations Day -- 359/1998 (25 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 359/1998 (Dec 25, 1998)
	Mission Day -- 488
	Orbit Number -- 98359

	Pass Highlights:  station:  DSS-66      AOS: 13:25        LOS:
16:30


	Pass Summary: Nominal recorder dump. Ran DPS.


	Anomalies: NONE


	Activities:
13:25:00	BOT
13:24:09	SSR-B  placed in RECORD Operate Mode
13:24:57	SSR-A  placed in PLAYBACK Operate Mode
13:26:08	Time Tag bins loaded for LOS
13:37:29	S/C commanded to SCIENCE Downlink Format
15:55:00	SSR  playback completed
16:03:46	S/C commanded to ADC Downlink Format
16:04:00	Poke commands issued to Active and Inactive C&DH
16:07:54	Time Tag bins loaded for next day AOS time
16:30:00	EOT


BACK
Operations Day -- 360/1998 (26 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 360/1998 (Dec 26, 1998)
	Mission Day -- 489
	Orbit Number -- 98360

	Pass Highlights:  station:  DSS-66      AOS: 13:00         LOS:
16:35


	Pass Summary: Nominal recorder dump. Ran DPS.


	Anomalies: NONE


	Activities:
13:05:00	BOT
13:03:53	SSR-A  placed in RECORD Operate Mode
13:04:43	SSR-B  placed in PLAYBACK Operate Mode
13:06:10	Time Tag bins loaded for LOS
13:15:44	S/C commanded to SCIENCE Downlink Format
15:28:00	SSR  playback completed
16:09:37	S/C commanded to ADC Downlink Format
16:10:28	Poke commands issued to Active and Inactive C&DH
16:10:47	Time Tag bins loaded for next day AOS time
16:35:00	EOT


BACK
Operations Day -- 361/1998 (27 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 361/1998 (Dec 27, 1998)
	Mission Day -- 490
	Orbit Number -- 98361

	Pass Highlights:  station:  DSS-66      AOS: 13:01        LOS:
16:25


	Pass Summary: Nominal recorder dump. Six-minute delay on BOT due to
TGC swap. NO adverse
	impact on pass. All data retrieved. Ran DPS.

	Anomalies: NONE


	Activities:
13:01:00	BOT
13:03:08	SSR-B  placed in RECORD Operate Mode
13:03:54	SSR-A  placed in PLAYBACK Operate Mode
13:05:03	Time Tag bins loaded for LOS
13:15:43	S/C commanded to SCIENCE Downlink Format
16:02:00	SSR  playback completed
16:00:01	S/C commanded to ADC Downlink Format
16:01:00	Poke commands issued to Active and Inactive C&DH
16:04:32	Time Tag bins loaded for next day AOS time
16:25:00	EOT

BACK
Operations Day -- 362/1998 (28 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 362/1998 (Dec 28, 1998)
	Mission Day -- 491
	Orbit Number -- 98362

	Pass Highlights:  station:  DSS-66      AOS= 13:00:31
LOS = 16:35:00


	Pass Summary:
	 - Nominal Support w/ SSR Playback completed

	Anomalies:


	Activities:
13:05:00	BOT w/ DSS 66
13:06:11	SSR A placed in RECORD Operate Mode
13:06:58	SSR B  placed in PLAYBACK Operate Mode
13:08:06	Time Tag bins loaded for LOS
13:14:33	S/C commanded to SCIENCE Downlink Format
15:40:15	SSR B playback completed
16:09:38	S/C commanded to ADC Downlink Format
16:11:15	Poke commands issued to Active and Inactive C&DH
16:13:45	Time Tag bins loaded for next day AOS time
16:35:00	EOT w/ DSS 66


BACK
Operations Day -- 363/1998 (29 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 363/1998 (December 29, 1998)
	Mission Day -- 492
	Orbit Number -- 98363

	Pass Highlights:  Station      AOS = 12:58:06                  LOS
= 16:45:00
	                                  DSS-61


	Pass Summary:
	 - Executed nominal Attitude Maneuver  and  nominal SSR playback
	        Pre-Maneuver    =  Sun Angle =  6.31 deg     HGA = - 3.9
deg    Spin Rate  =  4.9361 rpm
	        Post-Maneuver =   Sun Angle = 14.25 deg     HGA =  4.3 deg
Spin Rate =  4.9375 rpm

	Anomalies:

	Activities:
13:15:00	BOT  w/ DSS 61
13:22:10	SSR B placed in RECORD Operate Mode
13:22:55	SSR A  placed in PLAYBACK Operate Mode
13:25:08	Time Tag bins loaded for LOS
13:27:58	Radial Catbeds Powered ON for Attitude Maneuver
14:41:44	Attitude Maneuver Started -  (Procedure a1998363_01cmds)
14:48:38	Attitude Maneuver Completed (34 pulses)
14:53:34	Catbeds Powered OFF
15:19:14	S/C commanded to SCIENCE Downlink Format
15:53:32	SSR A playback completed
16:20:48	S/C commanded to ADC Downlink Format
16:21:37	Poke commands issued to Active and Inactive C&DH
16:25:01	Time Tag bins loaded for next day AOS time
16:45:00	EOT w/ DSS 61

BACK
Operations Day -- 364/1998 (30 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 364/1998 (December 30, 1998)
	Mission Day -- 494
	Orbit Number -- 98364

	Pass Highlights:  station:  DSS-27      AOS = 16:16:07
LOS = 19:50:00


	Pass Summary:
	All operations nominal with exception of TPOCC packet extractor
crash.  All SSR data was recovered
	Informed by JPL Ops chief that during support Message Switching
equipment would be changed at JPL and would possibly affect incoming
telemetry for a few seconds.   ACE MOC experienced no tlm loss.

	Anomalies:
	G98-0255  -  TPOCC Packet Extractor Crash -

	Activities:
16:20:00	BOT w/ DSS 27
16:25:10	SSR A placed in RECORD Operate Mode
16:25:54	SSR B  placed in PLAYBACK Operate Mode
16:27:00	Ground Anomaly - TPOCC packet extractor crash
16:35:00	TPOCC system back on-line
16:45:10	Time Tag bins loaded for LOS
17:03:43	S/C commanded to SCIENCE Downlink Format
19:21:46	SSR B  playback completed
19:29:20	S/C commanded to ADC Downlink Format
19:29:35	Poke commands issued to Active and Inactive C&DH
19:33:29	Time Tag bins loaded for next day AOS time
19:50:00	EOT w/ DSS 27

BACK
Operations Day -- 365/1998 (31 Dec 98)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 365/1998 (December 31, 1998)
	Mission Day -- 494
	Orbit Number -- 98365

	Pass Highlights:  station:  DSS-66      AOS = 13:00:09
LOS = 16:35:00


	Pass Summary:
	Nominal Support

	Anomalies:
	None

	Activities:
13:05:00	BOT w/ DSS 66
13:13:07	SSR B placed in RECORD Operate Mode
13:13:51	SSR A placed in PLAYBACK Operate Mode
13:15:20	Time Tag bins loaded for LOS
13:43:27	S/C commanded to SCIENCE Downlink Format
15:24:59	SSR A  playback completed
16:10:49	S/C commanded to ADC Downlink Format
16:11:14	Poke commands issued to Active and Inactive C&DH
16:14:18	Time Tag bins loaded for next day AOS time
16:35:00	EOT w/ DSS 66

BACK