Operations Day -- 305/1997 (1 Nov 97)
Pass Summary: 
Nominal pass with full SSR data recovery (including some redumps of day 304 
data that had not been completely recovered).

 Activities:
1335    AOS Station D16
1343    Commanded S/C to 76k ADC Downlink Format
1346    Commanded S/C to Science Downlink Format
1346    SSR B Redump Begun
1400    SSR B Redump Completed
1403    SSR B put in Record Operating Mode
1409    SSR A put in Playback Operating Mode
1431    ADS Program Started
1606    SSR A Redumps Begun
1628    SSR A Redumps Completed
1720    Commanded S/C to ADC Downlink Format
1734    Commanded S/C to RTSW Downlink Format
1740    LOS Station D16

-------------------
BACK
Operations Day -- 306/1997 (2 Nov 97)
Pass Summary: 
Nominal pass with full SSR data recovery achieved.  One spacecraft anomaly 
was encountered during the pass when the Star Scanner reset flag failed 
checking twice within an eight minute period.  Other parameters that would 
usually be reset to zero during a Star Scanner reset such as the 'Valid 
Command Count' were not reset and the Scanner data looks fine.  This anomaly 
is being investagted to determine if the telemetry may have been corrupted 
when this flag state change was identified.  In addition, the FOT has 
turned on the Scanner 'Bitestar'.  The Bitestar has no valid function on the 
ACE Scanner but it will provide a sticky telltale if the Scanner resets since 
the actual 'reset' flag clears itself within 3 major frames after it is set 
but the Bitestar value will change to 'off' and remain off until reset from 
the ground.


Anomalies:
*  At 1741 and 1749, the continuous configmon flagged that the 
star_reset parameter was <> No.  The star_syncinit parameter also flagged.  
 
 Activities:
1349    AOS Station D24
1405    Commanded S/C to 76k ADC
1407    Commanded S/C to Science Downlink Format
1408    SSR A Put in Record Operating Mode
1412    SSR B Put in Playback Operating Mode
1652    SSR B Redumps Begun
1739    Redumps Completed
1740    Commanded S/C to ADC Downlink Format
1755    Commanded S/C to RTSW Downlink Format
1800    LOS Station 
D24

-------------------
BACK
Operations Day -- 307/1997 (3 Nov 97)
Summary:
Nominal pass with full SSR data recovery.  Two separate spacecraft health 
investigations were performed today.  The first involved using the inactive C&
DH selectable telemetry byte to look at a temperature sensor (DCM1_AD1) 
that APL had told the FOT may have failed (on the C&DH B side only) prior to 
launch.  Further investigation will be performed on day 308 to compare this C&
DH B value with the corresponding C&DH A value.

The second investigation was into the Star Scanner reset flag which seems to 
be turning on and off throughout the day.  This anomaly is being investigated 
as potentially a TPOCC database problem since the Scanner seems healthy 
otherwise and the other telltales that would indicate a software reset are 
not being set.  But, since the reset flag is not 'sticky' and clears itself 
after 3 major frames, the FOT, with APL concurrence, has set the 'Bite Star' 
flag via ground command.  This flag, which is not used by the ACE Scanner 
software, will act as a sticky telltale if a reset occurs since only a reset 
will turn this flag to 'off' where it will remain until commanded from the 
ground.


Anomalies:
G-0074   TPOCC display crash on AC1XT3   - no impact to operations
S-12         Star Scanner command rejected   - cause: The Bite Star 
command is uplinked in two pieces which must arrive at the Scanner 
within one major frame of each other.  Ground delays resulted in the 
second half of the command not reaching the Scanner in the alloted time - 
therefore the command was rejected.  Impact: The Star Scanner command reject 
incremented to 1.  The command was resent within the timing allowance and was 
accepted.

Activities:
13:31  AOS w/ D24
13:45  VC2 acquired at MOC
13:51  S/C commanded to SCIENCE downlink format
13:54  SSR B commanded to RECORD mode
13:57  SSR A commanded to PLAYBACK mode
14:02  Delta limit off directive completed for S3DPU mnemonics SSDSCMDERR and 
SSDVERSION at request of instrument team
 16:00  Command issued for select tlm byte for DCM1_AD1 (dual AD590 temp 
sensor)  Value = 9e
16:25  Started playback of missing slices for SSR A   (all missing slices 
redumped)
16:53  S/C commanded to ADC downlinkformat
16:56  Commands issued for setting Bite Star Flag ON for Star Scanner  -- 
uplinked 2 times due to command being rejected initially (Anomaly S-12) 
17:17  S/C commanded to RTSW format
17;35  LOS w/ 
D24

-------------------
BACK
Operations Day -- 308/1997 (4 Nov 97)
Summary:
Nominal pass which included an attitude reorientation maneuver to keep the 
spacecraft-Sun angle under 20 degrees and some commanding to the SEPICA 
instrument.  A request by the SEPICA instrument team for additional 
commanding had to be delayed until day 309 because the request arrived too 
close to end of the day's contact.

Activities:
13:21  AOS w/ D24
13:52  VC2 acquired at MOC
13:56 Radial catalyst bed heaters turned on
14:04  SSR A commanded to RECORD mode
14:08  SSR B commanded to PLAYBACK mode
15:00 Began attitude correction maneuver
15:03 Completed attitude correction maneuver
15:29  S/C commanded to Science format
16:33 Re-executed OCR #72 to turn off SEPICA SSSALARMUP3 alarm flag
16:41  Started playback of missing slices for SSR B   (all missing slices 
redumped)
17:08 Other scheduled SEPICA procedures cancelled due to lack of time
17:10  S/C commanded to ADC downlink format
17:30  S/C commanded to RTSW downlink format
17:40  LOS w/ D24

-------------------
BACK
Operations Day -- 309/1997 (5 Nov 97)
Summary:
Good pass with one data drop out of ~3 minutes caused by problems at JPL.  
Commanding was performed for the SWICS, CRIS and S3DPU instruments.  
In the case of S3DPU and CRIS, some commands were rejected by the 
instruments.  One of the CRIS commands, which had been successfully sent in 
earlier command sessions, was not accepted by the instrument.  The instrument 
team is investigating the possible cause of this rejection.  Additional 
commands sent during this session were accepted by the CRIS instrument and 
processed normally.  Commanding to S3DPU involved loading a table that 
required 48 separate commands. When this load was uplinked the instrument 
rejected all 48 commands. Additional commands sent to the S3DPU were 
processed without errors. The S3DPU team is investigating this anomaly.   
Lastly, a SWICS high voltage ramp up session was completed without problems. 

Anomalies:
AR#G-0075   JPL com server problems  (3min 3sec data drop while playback of 
SSR)
AR#S-0014   CRIS command not accepted while commanding 
AR#S-0015  S3DPU commands rejected during commanding

Activities:
13:33  AOS w/ D24
13:52  VC2 and ADC format acquired at MOC
14:00  S/C commanded to SCIENCE format
14:02  SSR B placed in RECORD mode
14:06  SSR A placed in PLAYBACK mode
14:09  Telemetry dropout begins (AR#G-0075)
14:12  Telemetry dropout ends 
14:28  Operations for SWICS high voltage  
14:52  Operations for CRIS command request OCR#73  (commanding not completed -
- See AR#S-0014
16:12  Operations for S3DPU w/ addition of OCR#74)  (commanding not 
successful  AR#S-0015
16:34  Playback of SSR A missing slices  (all slices redumped)
17:16  S/C commanded to ADC format
17:35  S/C commanded to RTSW
17:40  LOS w/ D24

-------------------
BACK
Operations Day -- 310/1997 (6 Nov 97)
Summary:
Nominal pass with a succesfull checkout of new receiver software at Station 
D24.  Performed instrument commanding to the CRIS and SIS instruments.  Large 
increases in solar activity over the past few days have resulted in the Star 
Scanner False_Alarm_Count jumping from an average of ~20 per spacecraft 
rotation to a fluctuating value of between 70 and 100+.  In addition, the 
Scanner Background_Count has gone from ~0 up to ~17.  During this 
period Flight Dynamics has not noticed any degredation in the Scanner data.

Additionally, during this pass the FOT set the inactive C&DH Selectable 
Telemetry Byte to the XM_YM_FWDRAD_T at the request of APL to determine the 
status of this sensor, which had failed prior to launch.  Comparison of the C&
DH A and C&DH B values for this sensor showed that the C&DH B side sensor 
is now operating normally.  This information has been forwarded to APL and 
the ACE Project.

Lastly, an investigation into why the Star Scanner appeared to be performing 
a software reset every few minutes identified a problem with the TPOCC 
database that is causing this a number of Scanner parameters to flag 
incorrectly.  The FOT verified that the Scanner has not performed a reset and 
is healthy.

Anomalies:
1. Star scanner false alarm count STAR_FA_CNT jumped to 70-100 false alarms 
per rotation after X2 solar flare of previous two days.
2. DSN station D24 tested new Block 5 receiver exciter software at 1716 and 
1717.  No discrepancies noted at MOC.

Activities:
13:40  AOS w/ D24
13:51  VC2 and ADC format Acquired at MOC
13:56  SSR A placed in RECORD mode
14:01  SSR A placed in PLAYBACK mode
14:08  S/C commanded to SCIENCE format
16:10  CRIS firmware check (OCR #75)  was successful
16:24 SIS firmware check (OCR #75 continued) was successful
16:27  Playback of SSR B missing slices  (all slices redumped)
17:08  S/C commanded to ADC format
17:17 DSN Block 5 software test
17:28  S/C commanded to RTSW(low rate)  format
17:40  LOS w/ D24

-------------------
BACK
Operations Day -- 311/1997 (7 Nov 97)
Summary:
Nominal pass which included an attitude correction maneuver and commanding to 
the SIS instrument to take advantage of the current state of increased solar 
activty.  Reduction in the severity of solar activity have occurred over the 
last 24 hours and the ACE Star Scanner False_Alarm_Count has dropped from a 
high of over 100 back down to a nominal value of ~20.  In addition, the 
Scanner Background_Count has dropped from ~17 to ~0.  It appears that no 
permanent damage was done to the Scanner during this event.  In addition, no 
effects were seen on the ACE SSRs during this increase in solar activity.

Activities:
13:18  AOS w/ D16
13:23  VC2 acquired at MOC in ADC format
13:26  SSR B placed in RECORD mode
13:30  SSR A placed in PLAYBACK mode
13:31  Radial catbeds commanded to ON for attitude manuever
14:38  Began attitutude manuever 12 pulses (proc name a1997311_cmds01)
14:40  Attitude manuever complete
14:42  Radial catbebds commanded to OFF 
15:06  S/C commanded to SCIENCE format
15:55  Redump of missing slices from SSR A playback (three slices not 
redumped due to time)
16:10  SIS command operations (OCR 76 for solar flare activity commanding
16:45  Commanded S/C to ADC format
16:47  Commanded S/C to RTSW format
16:55  LOS w/ D16

-------------------
BACK
Operations Day -- 312/1997 (8 Nov 97)
Summary:
Nominal pass which included full SSR data recovery and commanding to the SIS 
instrument to take advantage of increased levels of solar activity.

Activities:
16:01  AOS w/ D16
16:08  VC2 acquired at MOC with ADC downlinkformat
16:11 Spacecraft commanded to SCIENCE downlink format
16:12  SSR A placed in RECORD mode
16:17  SSR B placed in PLAYBACK mode
16:29 Began SIS commands for solar flare performance testing
19:01  Redump of missing slices from SSR B playback 
19:33  Commanded S/C to ADC downlink format
19:47  Commanded S/C to RTSW downlink format
20:00  LOS w/ 
D16

-------------------
BACK
Operations Day -- 313/1997 (9 Nov 97)
Summary:
Nominal pass with full SSR data recovery.

Activities:
13:48  AOS w/ D24
14:06  VC2 acquired at MOC with ADC downlink format
14:09  S/C commanded to SCIENCE downlink format
14:12  SSR B placed in RECORD mode
14:15  SSR A placed in PLAYBACK mode
14:20  ADS program run for FDF 
16:32  Playback of SSR A missing slices intitiated (All missing slices 
redumped)
17:26  S/C commanded to ADC downlink format
17:38  S/C commanded to SCIENCE downlinkformat to verify S3dpu cfgmon chk 
which was O.K.
17:45  S/C commanded to RTSW downlink format 
17:50  LOS w/ D24

-------------------
BACK
Operations Day -- 314/1997 (10 Nov 97)
Summary:
Today's pass included a thirty minute data dropout due to Nascom line 
problems between GSFC and JPL.  Full SSR data recovery was achieved and a 
significant portion of the pass was spent on commanding to both the SWICS and 
SWIMS instruments.  The SEPICA and SIS instrument teams decided against 
performing commanding that was scheduled for today.

Anomalies:
Anomaly G-0076 (Data line down between Goddard and JPL)

Activities:
14:08 - AOS with D24
14:27 - S/C placed in Science downlink format 76384
14:39 - SSR A placed in record mode
14:43 - SSR B dump started
15:15 - OCR 78 started (SWICS activities)
16:09 - OCR 78 complete
16:14 - SWIMS high voltage activities started
16:39 - SWIMS higi voltage activities complete
17:14 - SWIMS stepping table load started
17:23 - SWIMS stepping table load complete
17:24 - SSR B redump started
17:36 - Data dropout (anomaly G- 0076 )
18:03 - Telemetry back on line
18:15 - Spacecraft configured for RTSW downlink format at 434 bps
18:20 - EOT

-------------------
BACK
Operations Day -- 315/1997 (11 Nov 97)
Summary:
Good pass with a brief data dropout at the end of the pass because the 
personnel at station D16 brought down their telemetry system early by 
mistake.  Commanding was performed for the SIS, SWICS, and SWIMS instrument 
teams. The SEPICA team called the MOC to check on some telemetry values but 
decide not to perform commanding during this contact.  Because the SWIMS 
instrument did not respond properly to the initial commanding session 
performed early in the pass, the FOT performed additional commanding toward 
the end of the pass which cut short the time available to redump missing 
frames of SSR data.  Even without these redumps, SSR recovery for this pass 
was over 99%.

Anomalies:
G-0077 (Early EOT due to drive off at incorrect time)

Activities:
13:24 - AOS
13:34 - Science format started at 76384 rate
13:37 - SSR B placed in record format
13:41 - SSR A dump started , 560 slices
15:36 - OCR 80 completed (SWICS activities)
16:10 - SWIMS high voltage activities completed
16:19 - SWIMS stepping table load complete
16:30 - OCR 79 completed (SIS activities)
16:40 - SWIMS stepping table load complete
16:41 - SSR A dump complete
16:57 - OCR 81 complete (SIS activities)
17:12 - RTSW fromat started, 434 rate
17:23 - EOT (see Anomaly G-0077)

-------------------
BACK
Operations Day -- 316/1997 (12 Nov 97)
Summary:
Nominal pass (this pass was only 3.25 hours in length due to DSN scheduling 
constraints) which included an attitude maneuver  and commanding to the CRIS 
and SIS instruments.  The CRIS instrument stopped transmitting science data 
and stopped accepting commands during this pass.  The instrument team decided 
to have the FOT power-cycle the instrument to see if it would recover.  
After the power cycling was completed, the instrument began responding to 
commands and transmiting telemetry.  Additional CRIS commanding was performed 
during the remainder of the pass to configure and check-out the instrument 
and the instrument team is currently investigating the cause of this 
anomaly.  Due to the short pass length, manuever operations, and the CRIS 
anomaly, the spacecraft remained in ADC downlink format for the entire pass 
(full CRIS and SIS data is in this format).  Science format telemetry was 
being recorded during this entire period so there is no overall mission 
impact to using ADC downlink format for the duration of the pass.

Anomalies:
Anomaly S-0015  - CRIS housekeeping data nominal, but no science data seen. 
Also, commands not accepted by instrument

Activities:
13:46 - AOS D24
14:05 - ADC downlink format initiated, 76384 rate
14:13 - SSR A placed in record format
14:16 - SSR B dump started
14:19 - Radial catbeds on
14:32 - SIS commanding started
14:42 - First 2 commands from OCR 76 done in response to Anomaly S-0015 - 
CRIS anomaly
15:08 - SIS commanding complete
15:12 - OCR 82 started - CRIS emergency shutdown
15:33 - Attitude maneuver started
15:37 - Attitude maneuver complete
15:40 - Radial catbeds off
15:47 - Continued with OCR 82 - CRIS startup and checkout
16:18 - OCR 82 completed
16:18 - CRIS survival heater disabled
16:21 - OCR 2 executed - CRIS activities
16:23 - First command of OCR 3 executed - CRIS
16:34 - OCR 25 executed - Step 2,3, proc CRIS_SEMI_COLON, step 5
16:37 - OCR 37 executed -CRIS activities
16:45 - OCR 60 executed - CRIS activities
17:03 - CRIS thresholds adjusted
17:06 - SSR end of dump activities performed
17:12 - RTSW downlink format, 434 rate initiated
17:15 - LOS D24

-------------------
BACK
Operations Day -- 317/1997 (13 Nov 97)
Summary:
Nominal pass which include a total of three hours of activities dedicated to 
the SIS instrument.

Activities:
13:51 - AOS D24
14:10 - ADC downlink format started, 76384 rate
14:17 - Science downlink format started
14:19 - SSR B placed in record format
14:22 - SSR A dump started
14:32 - SIS activities started
15:23 - D24 rebooted MDA (Metric Data Assembly), ranging restarted
17:32 - SIS activities complete
17:34 - SSR dump activities complete - no redumps done
17:48 - RTSW downlink format started, 434 rate
17:55 - EOT D24

-------------------
BACK
Operations Day -- 318/1997 (14 Nov 97)
Status: O

Summary:
Nominal pass which included full SSR data recovery along with a high-voltage 
ramp up session and additional commanding to the SWIMS instrument.

Activities:
14:00 - AOS D24
14:17 - ADC downlink format, 76384 rate started
14:32 - SSR A placed in record format
14:37 - SSR B dump started
14:46 - SWIMS high voltage activities started
15:11 -  SWIMS activities complete
17:45 - SSR B redumps complete
17:48 - SWIMS power supply activities completed
17:51 - OCR 82 complete (SWIMS mode change)
18:08 - RTSW downlink format, 434 rate started
18:15 - EOT D24

-------------------
BACK
Operations Day -- 319/1997 (15 Nov 97)
Status: O

Summary:
Nominal pass with full SSR data recovery achieved.  The FOT performed a 
number of spacecraft housekeeping activities during this pass including:  
setting the C&DHB selectable telemetry byte as part of an 
ongoing investigation concerning fluxuations seen in the C&DHB current draw; 
dump and ground-image compare of all C&DHA block bins (0 miscompares); and 
lastly, the FOT toggled through all of the SSRA telemetry sections to ensure 
that there were no problems with the SSR after last weeks high level of solar 
activity (no errors found).  A checkout of SSRB will be performed on day 320.

Activities:
14:01 - AOS D24
14:17 - ADC downlink format, 76384 started
14:20 - SSR B placed in record format
14:23 - SSR A dump started
14:27 - Set CDH B selectable telemetry byte to 2109 for CDH B current
14:58 - Started ADS
15:56 - Shut down ADS
15:57 - Started block bin dump
16:32 - Block bin dump complete - 0 miscompares
17:16 - SSR A redumps complete
17:18 - SSR A memory segment checkout started
17:28 - SSR A memory segment checkout complete - 0 errors
17:57 - RTSW downlink format, 434 rate started
18:10 - EOT 
D24

-------------------
BACK
Operations Day -- 320/1997 (16 Nov 97)
Summary:
Nominal pass with full SSR data recovery along with commanding to the SIS 
instrument.  In addition, the FOT performed a number of C&DH housekeeping 
activities including:  1. Changing to the Autonomy 1 and Autonomy 2 
housekeeping formats to ensure that the proper bins are loaded and enabled 
and to check the Act-On Counts for all bins (results were nominal); 2. 
Scrolling through all of the SSRB telemetry sections to ensure that this 
recorder was not damaged during last weeks high levels of solar activity 
(results were nominal (SSRA was checked on day 319)); 3. Collecting some data 
on the C& DH B current (using the inactive Selectable Telemetry Byte) as part 
of an ongoing investigation into minor fluxuations in the C&DH B current that 
have been identified.

Activities:
1410    AOS D24
1420    Commanded S/C to 76k ADC Downlink Format
1423    Commanded S/C to 76k Science Downlink Format
1424    SSR A put in Record Operating Mode
1429    SSR B put in Playback Operating Mode
1534    SIS Instrument Activities Begun.
1545    Turned on C&DH B I sequential Print and Opened DSN MON History File
1543    FDF ADS Program Started
1636    Scrolled through Autonomy 1&2 Housekeeping Formats to verify status 
of loaded Autonomy Bins
1727    Completed SIS Commanding
1728    Scrolled through SSR B's 30 Telemetry Sections
1740    Commanded S/C to 76k ADC Downlink Format
1757    Commanded S/C to RTSW Downlink Format
1805    LOS D24

-------------------
BACK
Operations Day -- 322/1997 (18 Nov 97)
Pass Summary: 
Nominal pass with full SSR data recovery and extensive commanding to the 
SWIMS and SIS instruments.   
 
 Activities:
18:41 AOS D42
18:50 Commanded S/C to 76k ADC Downlink Format
18:52 SSR A put in Record
18:54 SSR B put in Playback
18:57 S/C commanded to Science Downlink Format
18:58 SWIMS Vfps Table Uploaded
19:17 SWIMS Table Load Completed
19:18 SWIMS High Voltage Config Procedure run
19:20 SWIMS HV Config Completed
19:20 SWIMS High Voltage Adjust
19:24 SWIMS HV Adjust Completed
19:29 SIS Single_Start Procedure Begun
19:36 SIS Single_Start Procedure Completed
19:53 SIS m1b_select_off Procedure Begun
21:29 SIS Procedure Completed
21:29 SIS SINGLE END Procedure Begun
21:34 SIS Single_End Completed
21:35 S/C Commanded to ADC Downlink Format.
21:40 SSR B Playback Complete
21:58 S/C Commanded to RTSW Downlink Format
22:00 LOS D42

-------------------
BACK
Operations Day -- 323/1997 (19 Nov 97)
Summary:
Todays pass was shortened to 3.5 hours because of a spacecraft emergency that 
was declared (not by ACE) that required the use of D16 equipment.  In 
addition, ranging was not done during this pass because the Shuttle needed 
the ranging equipment for D17 support (and they have priority).  Full SSR 
data recovery was achieved today and the FOT continued investigating small 
variations in the C&DH B current.  The other ongoing investigation supported 
today was the collection of DSN AGC information in an effort to determine how 
well the operational signal strength data matches the prelaunch predictions.

Activities:
14:05 AOS D16
14:13 Commanded S/C to 76k ADC Downlink Format
14:16 SSR B put in Record
14:19 SSR A put in Playback
14:20 Commanded S/C to Science Downlink Format
14:21 CDH B I Sequential Print started.  Opened DSN MON Block History file
16:21 SSR A Redumps Begun
16:39 SSR A Redumps 
17:24 Commanded S/C to ADC Downlink Format
17:37 S/C Commanded to RTSW Downlink Format
17:45 LOS D16

-------------------
BACK
Operations Day -- 325/1997 (21 Nov 97)
Summary:
Todays pass included a 20 minute telemetry dropout due to a SFG swap at JPL.  
The FOT was not notified of this upcoming swap prior to the telemetry drop 
but all of the data lost during this period was recoverable.  Extensive 
commanding to the SIS and SWEPAM E&I instruments was performed today along 
with an attitude correction maneuver.

Anomalies:
 *  DR#N44637- SFG Swap at JPL.  No Telemetry in MOC from 16:41:57-17:05:33.
 
 Activities:
14:06 AOS D16
14:15 S/C Commanded to 76k ADC Downlink Format
14:18 SSR B put in Record
14:22 SSR A put in Playback
14:18 Radial Catbed Heaters powered ON
14:39 SIS_SINGLE_START procedure begun
14:44 SIS_SINGLE_START procedure completed
14:49 SIS M1B_GND_BINARY1 Started at Step 15.  through step 22, to step 37 
(In total)
15:24 Stopped SIS commanding for Maneuver preparation
15:42 Attitude Correction Manuever Begun
15:46 Attitude Correction Manuever Completed
15:48 Radial Catbed Heaters powered OFF
16:01 Completed:  SIS M1B_GND_BINARY1 Started at Step 15.  through step 22, 
to step 37 (In total)
16:02 SIS_SINGLE_END procedure started
16:05 SIS_SINGLE_END procedure completed
16:09 S/C commanded to ScienceDownlink Format
16:14 SWPI_CYCLE(9) procedure run.  Completed @ 161448.
16:16 SWPE_CYCLE(1) procedure run.  Completed @ 161656.
16:19 SWPE_CYCLE(A) procedure run.  Completed @ 161848.
16:20 SWPE_MODIFY_MEMORY procedure started.  Completed @ 162440.
16:30 SWPE_CYCLE(8) procedure run.  Completed @ 163032.
16:31 SWPE_CYCLE(9) procedure run.  Completed @ 163136.
16:42 Telemetry went Static (DR# N44673)
17:05 Telemetry Active again
17:10 SWPE_CYCLE(A) procedure run.  Completed @ 171048.
17:12 SWPE_CYCLE(A) procedure run.  Completed @ 171224.
17:14 SWPI_CYCLE(9) procedure run.  Completed @ 171432.
17:16 SWPI_CYCLE(A) procedure run.  Completed @ 171608.
17:18 SSR A Redumps Begun
17:34 SSR A Redumps Completed
17:36 S/C commanded to Science Downlink Format
17:58 S/C commanded to RTSW Downlink Format
18:05 LOS D16

-------------------
BACK
Operations Day -- 326/1997 (22 Nov 97)
Summary:
Nominal pass which included full SSR recovery and commanding to the SIS 
instrument. 
  
 Activities:
14:45 AOS D24
14:51 S/C Commanded to 76k ADC Downlink Format
15:04 SSR A put in Record
15:10 SSR B put in Playback
15:36 S/C commanded to Science Downlink Format
15:38 SIS_SINGLE_START procedure begun
15:43 SIS_SINGLE_START procedure completed
15:59 SIS M1B_GND_BINARY1 Started at Step 1.  through step 14, 19-22, skip 
to step 37 
17:36 Completed:  SIS M1B_GND_BINARY1 Started at Step 15.  through step 22, 
to step 37 (In total)
17:37 SIS_SINGLE_END procedure started
17:39 SIS_SINGLE_END procedure completed
17:45 SSR A Redumps Begun
17:55 SSR A Redumps Completed
17:58 S/C commanded to ADC Downlink Format
18:11 S/C commanded to Science Downlink Format
18:18 S/C commanded to RTSW Downlink Format
18:25 LOS D24

-------------------
BACK
Operations Day -- 327/1997 (23 Nov 97)
Summary:
Nominal pass with full data recovery and commanding to the SIS instrument.  
The MOC real-time software crashed during the SSR playback period when a bad 
VC1 frame was received from DSN.  After restarting the software the SSR dump 
continued nominally.  

Anomalies:
G-0082 - Packet extractor crash due to frame with bad data pointer

Activities:
14:12 - AOS
14:25 - ADC downlink format, 76384 rate started
14:29 - SSR B placed in record mode
14:33 - SSR A dump started, 560 slices
14:36 - ADS software started
14:53 - SIS commanding started
15:35 - ADS software terminated
17:12 - TPOCC packet extractor crash during SSR A redump - Anomaly G-0082
17:49 - SIS commanding complete
18:12 - RTSW downlink format started, 434 rate
18:20 - 
EOT

-------------------
BACK
Operations Day -- 328/1997 (24 Nov 97)
Summary:
Nominal pass with full SSR data recovery and commanding to the SWEPAM E&I 
instruments.

Activities:
14:21 - AOS D16
14:24 - ADC downlink format started, 76384 rate
14:27 - SSR A placed in record mode
14:31 - SSR B dump started
15:23 - SWEPAM-E high voltage activities started
15:56 - SWEPAM-I high voltage activities started
16:43 - SWEPAM-E high voltage activities complete
16:45 - SWEPAM-I high voltage activites complete
17:23 - SSR B redumps complete
17:42 - RTSW downlink format started, 434 rate
17:50 - EOT D16

-------------------
BACK
Operations Day -- 329/1997 (25 Nov 97)
Summary:
Nominal pass which included an attitude correction maneuver and commanding to 
the SWEPAM E&I, and SWIMS instruments.  Todays pass had a higher than normal 
number of missing VC2 frames in the initial SSR dump (45 compared to a 
nominal day when there are less than 10).  Time required for the attitude 
maneuver and for the instrument commanding prohibited the FOT from recovering 
all of the missing SSR frames.  The remaining frames will be redumped on day 
330.

Anomalies:
14:32:00 Rcvr B was not in-lock on acquisition.  Ran G_INITIAL_CONTACT 
anyway.  Asked DSS16 to resweep, receiver was in-lock after resweep.

Activities:
14:32:00 - DSS16 AOS
14:37:00 - DSN reswept uplink
14:38:00 - Commanded spacecraft to 76384 downlink rate - ADC downlink format
14:42:00 - Cat bed heaters on
14:44:00 - SSR B placed in record mode
14:48:00 - SSR A playback started
15:49:00 - Attitude reorientation maneuver
16:31:00 - Commanded spacecraft to Science downlink format
16:32:00 - SWIMS operations
16:34:00 - SWEPAM-I  and E operations
17:15:00 - SSR A dump complete.  Did not complete all redumps due to limited 
time.
18:06:00 - Commanded spacecraft to ADC mode
17:42 - Commanded spacecreaft to RTSW 434 bit downlink rate
17:45:00 - DSS16 
LOS

-------------------
BACK
Operations Day -- 330/1997 (26 Nov 97)
Summary:
Todays pass included commanding to the SEPICA instrument.  In addition, The 
initial SSR replay included a large number of dropped frames.  The FOT 
recovered as many of these frames as possible within the time allocated for 
the pass.

Activities:
1434   AOS W/ D16
1452  VC2 received at MOC -- ADC downlink format
1456  SSR A  commanded to Record mode
1459  SSR B commanded to Playback mode
1501  S/C commanded to SCIENCE format
1510  Executed OCR 86(b) for SEPICA -- Cleared Fan3 pressure alarm
1729  Redump of SSR B slices  -  redump of approx. 70% of dropped frames
1819  S/C commanded to ADC downlink format
1838  S/C commanded to RTSW downlink format
1845  LOS W/ D16

-------------------
BACK
Operations Day -- 331/1997 (27 Nov 97)
Summary:
Today's pass was nominal except that - once again - there were a fairly large 
number of dropped frames during the initial SSR playback.  The FOT will 
investigate this problem to determine if it can be remedied by changes in the 
DSN configuration.

Activities:
1450   D16 AOS
1455  Spacecraft commanded to high rate - ADC downlink format
1500  Spacecraft commanded to Science downlink format
1501  SSR B  commanded to Record mode
1505  SSR A commanded to Playback mode
1734  Redump of SSR B slices  -  redump approx. 80% of dropped frames
1825  Spacecraft commanded to ADC downlink format
1836  Spacecraft commanded to RTSW downlink format
1850  D16 LOS  

-------------------
BACK
Operations Day -- 332/1997 (28 Nov 97)
Summary:
Todays pass again contained numerous frame drops during the SSR replay.  
Contacted D16 - They were seeing good data.  Also contacted IPNOC who also 
verified seeing clean data.  JPL reloaded SFG but frame drops continued.  In 
addition, todays pass started 39 minutes late because the TRMM launch slip 
took priority over previously scheduled ACE time at D16.  Commanding to the 
SWIMS instrument was also accomplished during this pass.

Anomalies:
1634  DR#N44685 JPL reload SFG (special function gateway)  caused 2min 22 sec 
TLM/CMD outage
 Covered by Anomaly report G97-099

Activities:
1335  AOS w/ D16
1444  VC2 acquired at MOC - ADC downlink format
1450  SSR A placed in Record mode
1454  SSR B placed in Playback mode
1500  Started SWIMS command operations  -  SWM LOAD procedure
1510  Completed SWIMS command operations
1721  Redump of SSR B slices -  80% of missing frames redumped
1828  S/C commanded to ADC downlink format
1835  S/C commanded to RTSW downlink format
1840  LOS w/ D16

-------------------
BACK
Operations Day -- 333/1997 (29 Nov 97)
Summary:
Nominal pass which included an attitude correction maneuver.

Anomalies:
Station DSS61 was unable to see test block during precal.  Station informed 
us that they are not able to see these test blocks from any mission.

Activities:
11:40:00 - DSS 61 AOS
11:56:00 - Commanded spacecraft to 76384 downlink rate - ADC downlink format
12:11:00 - SSR B placed in record mode
12:13:00 - SSR A playback started
12:29:00 - Cat bed heaters on
13:39:05 - Attitude reorientation maneuver
14:16:00 - Commanded spacecraft to Science downlink format
14:23:00 - SSR A dump complete
14:49:00 - Commanded spacecraft to ADC downlink format
14:49:00 - Commanded spacecreaft to RTSW 434 bit downlink rate/format
15:15:00 - DSS 61 
LOS

-------------------
BACK
Operations Day -- 334/1997 (30 Nov 97)
Summary:
Today pass included a large number of frame drops and a crash of the TPOCC 
Packet Extractor task during the SSR replay.  Commanding to the CRIS 
instrument was performed to take advantage of increases in solar 
activity.  During the CRIS commanding the CRIS science team noticed that the 
instrument's FORTH library may have become corrupted during the solar flux 
increase.  The library was dumped for investigation and future corrective 
actions will be planned for next week as necessary.

Anomalies:
AR S-0017  CRIS FORTH dictionary corruption caused by possible SOLAR WIND 
activity  334/16:10
AR G-97-100  TPOCC Packet extractor crash  during SSR B replay     334/18:17

Activities:
1501  AOS D16
1506  VC2 acquired - ADC downlink format
1509  SSR A placed in Record mode
1513  SSR B placed in Playback mode
1514  S/C commanded to Science downlink format
1519  ADS program started for FDF - Run time +30min
1600  Executed OCR # 97-0089  for CRIS/SIS commanding
1610  Executed OCR # 97-0090 for CRIS  -- due to FORTH dictionary location 
anomaly (SEE AR S0017)
1800  Began redump of missing frames from SSR B playback  - not all slices 
replayed due TPOCC crash 
1817  Began recovery from TPOCC Packet extractor crash
1828  TPOCC brought back on line
1830   CRIS OCR # 97-0090 completed
1834  S/C commanded to ADC downlink format
1850  S/C commanded to RTSW downlink format
1900  LOS D16

-------------------