ACE Weekly Report:  10-04-00

All ACE spacecraft subsystems are performing nominally.  An Attitude 
maneuver was successfully executed on 09-28-00.  The next attitude 
maneuver is scheduled for 10-05-00.

Maneuver Start Time=17:37:52     Maneuver End Time=17:44:47
Pre-Maneuver    HGA = -4.01 deg.     Sun Angle =  12.39 deg.
Post-Maneuver  HGA  = 4.45 deg.      Sun Angle =  5.02 deg.
Current S/C range:  1,467,448    km

On 09-29-00 ACE suffered a telemetry dropout for ~1 hour 4 minutes 
due to problems with the ISIS fanout and SFG process failures at JPL. 
All affected SSR data was redumped and successfully captured during 
the support.

On 10-02-00 realtime operations were transferred from the MOR to the 
MAR string of equipment.  This is in preparation for upcoming work on 
the MOR (addition of 9G drive and security patches) to begin on 
10-09-00.