ACE Weekly Report:  01-17-01

All ACE spacecraft subsystems are performing nominally.  An attitude maneuver
was successfully executed on 01-16-01.  The next attitude maneuver is scheduled
for 01-26-01.

Attitude Maneuver Start Time=17:49:25	Attitude Maneuver End Time=17:57:20
Pre-Maneuver  HGA = -4.43 deg.  Sun Angle =  6.33 deg.
Post-Maneuver  HGA  = 4.45 deg. Sun Angle =  8.03 deg.
Current S/C range:  1547264.653    km

SSR A's 30 telemetry sections were scrolled through on 01-10-01 to
verify the number of SBEs and DBEs.  No DBEs or new SBEs were
detected;  15 SBEs were originally detected in December 1999.    SSR
B's 30 telemetry sections were scrolled through on 01-13-01.  There
continue to be zero SBEs and DBEs.

Degraded telemetry was received intermittently for a total of ~1 hour
and 5 minutes during the support on 01-11-01.  All affected SSR
slices were redumped during the support [AR G01-0004, DR# N70744].

ACE MOC was notified that PDU-16 experienced a power failure on
01-17-01 at ~07:00 UTC.  The FOT verified that the only string
affected was the MOR string of equipment.  The TPOCC System
Administrators (TSMs) were notified and successfully brought back up
the system in time for the day's support.  No additional problems
were experienced as  a result of the power failure.