ACE Weekly Report:  05-02-01

All ACE spacecraft subsystems are performing nominally.  Attitude
maneuvers were successfully performed on 04-26-01 and 05-02-01.  The
next attitude maneuver is scheduled for 05-09-01.

OCR CRIS-011 was executed on 04-27-01; commands were sent to turn on
the image intensifier.

On 04-30-01 OCR SEP-087 was executed to begin ramping up SEPICA's
30kV power supply.  The SEPICA instrument has been ramped down since
October 2000 (Anomaly Report S00-0005).  The Instrument team has
decided to slowly 'raise the 30kV voltage, simultaneously observing
the current
and the 30kV temperature'.  The OCR SEP-087 will be completed over
several days.

================================================
Jacqueline Maldonado Snell
Honeywell Technology Solutions Incorporated (HTSI)
Goddard Space Flight Center
Bldg. 3 Rm N135C, Code 428.2
Greenbelt, MD 20771
Phone: (301) 286-7072
Fax:   (301) 286-0218
E-mail:   Jacqueline.Snell.1@gsfc.nasa.gov