ACE Weekly Report: 08-15-01

All ACE spacecraft subsystems are performing nominally.  An attitude maneuver
was performed on 8/07/01.  The next attitude maneuver is scheduled for
08/17/01.  A station keeping maneuver was performed on 08/10/01.  The ACE FOT
supported a Mission Verification test with DSN's DTF-21 on 8/09/01.  The MVTs
are 'designed as data flows using SIM data to verify the project to DSN
interfaces for new [26m Automation] equipment verification'.  Preliminary
reports from DSN state the MVT was a success.  ACE's string three has been
relocated from Building 3, Room S25 to Building 14, Room W10F.  FOT checkout
is scheduled to begin following the completion of a necessary TLAN router
reconfiguration.  FOT testing is scheduled to take ~10 days.

Anomalies:
8/10/01 - MOC received slightly degraded telemetry from D27.  A resweep was
performed and data quality improved.  All affected SSR slices were redumped.