ACE Weekly Report 10-24-01

All ACE spacecraft subsystems are performing nominally.  Attitude 
maneuvers were performed on 10/18/01 and 10/24/01.  The next attitude 
maneuvers are scheduled for 10/30/01 and 11/06/01.

Two ULEIS OCRS were executed this week as part of an ongoing 
diagnostic effort to debug the autonomous shutter motion algorithm. 
OCR ULEIS-066 was executed on 10/19/01 and OCR ULEIS-067 on 10/22/01.

SSR B's 30 telemetry sections were scrolled through on 10-23-01 to 
verify the number of SBEs and DBEs.  It continues to have zero DBEs 
and SBEs.  SSR A's 30 telemetry sections will be scrolled through and 
verified on 10-26-01.

Anomalies:
G01-0117  10/22/01  During precal activities, Station D27 notified 
MOC that there were not receiving the test block.  FOT verified their 
configuration.  IP NOC notified after error message found in Isis log 
window.  IP NOC restarted the processes and the FOT recycled the MOC 
Isis software.  No further problems experienced during support.