ACE Weekly Report 12-12-01 All ACE spacecraft subsystems are performing nominally. An attitude maneuver was successfully performed on 12/07/01. The next attitude maneuver is scheduled for 12/13/01. FOT Checkout of String 1 has completed. ORR will be held TBD. Anomalies: 12/11/01 AR# G01-0131 Degraded telemetry received during first ~50 minutes of support. MOC informed D27 and telemetry channels were switched. Telemetry from both channels online from 17:09:13 to 17:09:22. The days SSR accounting statistics were skewed one slice by the 84 duplicated SSR frames received. Telemetry improved once channel 2 only online.