ACE Weekly 01/17/02 - 01/23/03

All ACE spacecraft subsystems are performing nominally. No attitude 
maneuvers were performed this week. The next maneuver is scheduled for 
01/24/03.

============================================================================
OCRs Executed:

NONE

============================================================================
Ongoing Activities:

TAPS:
Trending, Analysis and Plotting System (TAPS) development continues.  TAPS 
Release 4.1 was installed on TAPS #2 on 1/15/03.  Testing will continue on 
TAPS#2 until such time the VC2/VC4 extraction problem is resolved on TAPS #1.
Processing of the DSN 5-16 Monitor Blocks has been shelved at the present 
time to allow SGT to devote their attention to other higher priority 
requirements.
----------------------------------------------------------------------------
Automation (ROBOTT):
String 2 testing of the offline subsystem has been pushed back a week to 
Feb 3. The first release of Command & Control has also been pushed back to 
Feb 10. The first release of the Health and Safety Monitoring (HSM) is 
still scheduled for Jan 27th.

----------------------------------------------------------------------------
HGA Angle Constraint Report:
Will be released soon.

============================================================================
Anomalies:

No anomalies to report for this week.



~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Glen A. Miller
Honeywell Technology Solutions Inc.

ACE Flight Operations Team
Goddard Space Flight Center
Building 14, Room W10A
Mail Stop 428.2
Greenbelt, MD 20771

Office: 301-286-7071
Pager: 800-425-3174
Fax:    301-286-1729
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~