ACE Weekly 04/25/03 - 05/01/03

All ACE spacecraft subsystems are performing nominally. An attitude 
maneuver was executed on 04/25/03 successfully. The next attitude maneuver 
is scheduled for 05/07/03.

============================================================================
Orbit Events:

The next expected SEV transit is to occur:

Entry: 06/01/03 at 1442Z
Minimum angle: 2.18 degrees on 06/13/03 at 1618Z
Exit: 06/25/03 at 1652Z

============================================================================
OCRs Executed:

NONE

============================================================================
Ongoing Activities:

TAPS:
Trending, Analysis and Plotting System (TAPS) development continues with 
emphasis being placed on fixing the DRs attributed to the current release. 
Testing is progressing on both TAPS#1 and TAPS#2.

----------------------------------------------------------------------------
Automation (ROBOTT):

ACE ROBOTT Automation was installed onto TPOCC string-2 in the ACE MOC on 
05/01/03 for Release 0 Engineering Testing by the FOT.

Command & Control ES is continuing testing on TPOCC string-3.  Enhancements 
and corrections are required and will resume next week following completion 
or reduction of WIND and POLAR C&C ES development and testing.

Testing will soon begin with the receiving of 0158 Monitor data into the 
GENSAA Data Server (GDS).

============================================================================
Anomalies:

No anomalies occurred this reporting period.


~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Glen A. Miller
Honeywell Technology Solutions Inc.

ACE Flight Operations Team
Goddard Space Flight Center
Building 14, Room W10A
Mail Stop 428.2
Greenbelt, MD 20771

Office: 301-286-7071
Pager: 800-425-3174
Fax:    301-286-1729
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~