ACE Weekly 07/16/04 - 07/22/04

All ACE spacecraft subsystems are performing nominally.  An attitude 
maneuver was successfully executed on 07/22/04.  The next attitude maneuver 
is scheduled for 08/03/04.

============================================================================
Orbit Events:

The next ACE SEV transit will occur in the mid-Aug to early Sep '04 timeframe.

=====================================================================
OCRs Executed:

NONE

=====================================================================
Ongoing Activities:

TAPS:
- Installation of TAPS release 4.3 is occurred on 07/20/04.  FOT testing of 
this release is ongoing.

----------------------------------------------------------------------------
Automation (ROBOTT):

- ROBOTT v0.7 was installed on string 2 on 07/19/04.
   -- FOT is testing the 26 DRs fixed in v0.7 on string 2 and new DRs 
continue to
be documented.
   -- If critical DRs are found in v0.7, then the scheduled date for v0.8 
release
is 8/10/04.
- Additional FOT training sessions on ROBOTT are under development. 
Training sessions are tentatively scheduled for 07/28/04 and 08/03/04.

============================================================================
Extra Spacecraft Activities:

None

=====================================================================
Anomalies:

DOY 04202 (07/20/04) ACE Anomaly G04-0067 - GDS 34m (DSS-24) Telemetry Outage
At 13:25, the FOT lost telemetry from DSS-24.  DSS-24 confirmed data wasn't 
being sent and rebooted the TLP.  At 13:29, telemetry was back 
online.  IMPACT:  None.  All telemetry subsequently recovered.  DR# G104643.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Glen A. Miller
ACE Flight Operations Observatory Engineer
Honeywell Technology Solutions Inc.
Goddard Space Flight Center
Building 14, Room W10A
Mail Stop 428.2
Greenbelt, MD 20771

Office: 301-286-7071
Pager: 800-425-3174
Fax:    301-286-1729
gamiller@pop500.gsfc.nasa.gov
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~