ACE Weekly 03/11/05 - 03/17/05 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Maneuvers completed Type Attitude Attitude Attitude Station Keeping Date 03/11/05 03/11/05 03/17/05 03/17/05 DOY 070 2005 070 2005 076 2005 076 2005 Thrusters 2R 4R+ 4R- 2R 4R+ 4R- 2R 4R+ 4R- 3A 4A Duration 4:45 min 9:35 min 7:07 min 0:51 min Start Time 15:11:54z 16:20:32z 15:10:43z 16:46:29z Stop Time 15:16:39z 16:30:07z 15:17:50z 16:47:20z Firing 24 pulses 49 pulses 36 pulses continuous ============================================================================ OCRs: None ============================================================================ Ongoing Activities: Space Link Extension (SLE) - ACE SLE Requirements are being finalized and the Test Plan is being generated. ============================================================================ Extra Activities: SSR Telemetry Sections downlinked for both SSRs. No new Single Bit Errors (correctable) found. No non-correctable errors (Hard Single Bit Errors & Double Bit Errors) have occurred throughout the mission. ============================================================================ Anomalies: DOY 070 (03/11/05) ACE Anomaly G05-0037 Keyboard Failure Computer on backup string #3 failed. IMPACT: Minimal. Keyboard replaced by Hardware Maintenance. DOY 072 (03/13/05) ACE Anomaly G05-0038 MAD 34m (DSS-54) No TLM after BOT TLM stopped flowing to the MOC at BOT. Without current telemetry, ROBOTT software did not send commands initiating switch to hi-rate. Telemetry flow resumed at BOT+12min and commanding was initiated. DR#M103106 IMPACT: Activities delayed 12 minutes. DOY 073 (03/14/05) ACE Anomaly G05-0039 GDS 26m (DSS-16) CMD Mod Index Spacecraft was not accepting commands. FOT informed station of problem. Station discovered that the CMD MOD Index was incorrect. DR#G105421 IMPACT: Minimal. Activities delayed 10 minutes. DOY 074 (03/15/05) ACE Anomaly G05-0040 GDS 26m (DSS-16) TLM & CMD Problems TLM not flowing to MOC at BOT. TLM online at BOT+39min. Afterwards, spacecraft was not accepting commands. Station discovered that the CMD Mod Index was incorrect. DR#G105426 IMPACT: Minimal. Activities delayed 65 minutes. Pass was extended 35 minutes to complete playback. DOY 076 (03/17/05) ACE Anomaly G05-0041 ADS Software Froze During Startup ADS software froze during initialization. Processes were killed and ADS restarted successfully. This is an intermittent problem that last occurred Oct 2004. IMPACT: Minimal. ADS worked properly for maneuvers. DOY 076 (03/17/05) ACE Anomaly G05-0042 MAD 34m (DSS-54) No TLM after BOT TLM stopped flowing to the MOC at BOT+4min. Commands were not sent to initiate the switch to hi-rate. Telemetry flow resumed at BOT+21min and commanding was initiated. DR#M103115 IMPACT: Activities delayed 17 minutes