ACE Weekly 07/01/05 - 07/07/05

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

No attitude maneuvers were completed this week.  The next attitude maneuver
is scheduled for Monday 07/11/05.

============================================================================
OCRs:

None

============================================================================
Ongoing Activities:

Space Link Extension (SLE) - Development continues within the TDF
configuration.  The next ACE JPL telecon is scheduled for 07/21/05.  The
DSN/Developer test with DTF-21 is scheduled for 08/04/05.

ROBOTT - Version 1.0 is planned to be installed on String 3 for testing next
week.  The current version used for operation (v0.9) has 36 DRs documented.
Version 1.0 will correct 4 of these DRs.

============================================================================
Extra Activities:

07/01/05 - New SSR automatic carryover procedures successfully captured SSR
data lost due to the shortened pass on the previous day (06/30/05).

07/06/05 - There was no impact to operations from the NASCOM scheduled
replacement of GLAST switches.

============================================================================
Anomalies:

DOY 182 (07/01/05) ACE Anomaly S05-0021  SWICS SSCPAM5V
SSCPAM5V had a brief (<24 seconds) red high limit violation, value = -4.49V
(RH > -4.50V) at 10:39:30z.  Jim Raines notified.
IMPACT:  Awaiting instructions from Jim Raines.