ACE Weekly 08/12/05 - 08/18/05 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 08/18/05 DOY 230 2005 Thrusters 2R 4R+ 4R- Duration 9:59 min Start Time 16:48:04z Stop Time 16:58:03z Firing 51 pulses The next attitude maneuver is scheduled for Thursday 08/25/05. ============================================================================ OCRs: None ============================================================================ Ongoing Activities: Space Link Extension (SLE) - Development continues within the TDF configuration. The DSN/Developer test with DTF-21 is scheduled for 09/01/05. ROBOTT - Version 1.0 was installed on String 1 on Monday 08/15/05 for Operational Testing. The software will be used for lights out operations starting Saturday 08/20/05 ============================================================================ Extra Activities: DOY 227 (08/15/05) - SSR B 30 Telemetry Sections downlinked. No new Single Bit errors (correctable) found. DOY 228 (08/16/05) - DOY 231 (08/19/05) - All 4 DSN passes were changed due to the GOES-N launch slip. DOY 228 (08/16/05) - No impact to operations occurred from the preventive maintenance for UPS-13 in Bldg 14. ============================================================================ Anomalies: DOY 225 (08/13/05) ACE Anomaly G05-0106 C&DH B not commanded Incorrect CMD Mod Index (0.77dB instead of correct value of 1.69dB) was sufficient for C&DH A to be commanded but not C&DH B. Procedures continued execution, as designed, after C&DH B commands were not accepted so that SSR dumps and state of health checks could be completed. C&DH B needs to be commanded once every 80 hours to avoid antenna reconfiguration. C&DH B was successfully commanded on the next day (DOY 226). DR#N103032 IMPACT: 47.5 hours between C&DH B commands on DOY 224 and DOY 226. DOY 225 (08/13/05) ACE Anomaly G05-0107 Offline did not execute ROBOTT software did not execute the offline script used for report generation, data analysis and file maintenance. The ROBOTT developers have been notified. IMPACT: Report generation, data analysis and file maintenance was completed on Sunday (DOY 226) for both Saturday and Sunday. SSR redump list was not completed for the next support. Fortunately, no SSR redumps were necessary. DOY 227 (08/15/05) ACE Anomaly S05-0031 SWICS Limit Violation SSCPAM5V had 1 brief red high limit violation (>-4.5V). Jim Raines notified. 2005-227 15:51:37 - 15:52:13z -4.451 - -4.490V IMPACT: Awaiting instructions from Jim Raines. DOY 230 (08/18/05) ACE Anomaly G05-0108 Incorrect Station Commanded At 15:23:40z, three commands were sent to DSS-27 instead of DSS-16. The ACE pass had been rescheduled to DSS-16 due to the GOES-N launch slip and the support was configured using an old schedule. DR#G105963. IMPACT: Minimal. Software reconfigured for correct station.