ACE Weekly 10/14/05 - 10/20/05 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: No attitude maneuvers were completed this week. The next attitude maneuver is scheduled for Thursday 10/27/05. ============================================================================ OCRs: None ============================================================================ Ongoing Activities: Space Link Extension (SLE) - ACE Space Link Extension (SLE) development has been moved up in priority; less than one month development is estimated for completion. The next DTF-21 Developer tests are tentatively scheduled for 11/09/05 and 11/16/05. RIONet - String 3 is anticipated to move to the RIonet within a month. ============================================================================ Extra Activities: DOY 290 (10/17/05) No impact to operations from the network decommission of unused router interfaces on the Closed IONet LAN (1500-1530z). DOY 293 (10/20/05) Preparations for RIONet cable were performed in the ACE MOC (1200-1600z). ============================================================================ Anomalies: DOY 289 (10/16/05) G05-0129 Acetlanpc Reset At 0746z, the computer 'acetlanpc' reset for unknown reasons. IMPACT: DSN monitor data for Sunday was not saved. FTP server did successfully receive files for CD archiving. FOT logged in Monday morning and initialized SIMSS software. DOY 289 (10/16/05) G05-0130 Network Data Loss Network data loss resulted in 10% data not reaching MOC for 20 minutes (17:42:16-18:01:41z). Data loss was randomly spaced (1-2 blocks each drop). DR#N103128 IMPACT: Minimal. Data was redumped during the support. CDR file was not affected by data loss. DOY 290 (10/17/05) G05-0131 DSS-27 Commercial Power Failure Ground station experienced a complete electrical power failure at 18:10z. TLM was reestablished at 18:40:33z, uplink at 18:42:19. End of track was at 18:50:00z. DR#G106179 IMPACT: 30 minute outage. SSR playback and redumps had already been completed. Final state of health checks were not performed. DOY 291 (10/18/05) G05-0132 DSS-27 TLM/Uplink Lost Ground station received alarm "AC27 328: CURRENT TIME AFTER LAST PRED PT-ENTER ST." and lost TLM and Uplink at 17:23:23z. Telemetry was restored at 17:26:16, uplink at 17:29:30z. DR#G106186 IMPACT: 6 minute outage.