ACE Weekly 02/17/06 - 02/23/06

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

	Type         Attitude
	Date         02/22/06
	DOY          053 2006
	Thrusters    2R 4R+ 4R-
	Duration     12:53 min
	Start Time   16:56:43z
	Stop Time    17:09:36z
	Start HGA    5.91 deg
	Stop HGA     6.67 deg
	Firing       66 pulses

The next attitude maneuver is scheduled for Wednesday 03/01/06.

============================================================================
OCRs:

None

============================================================================
Ongoing Activities:

Space Link Extension (SLE) - The first version of ACE SLE was delivered to
the Library on December 14.  The delivery to the ACE MOC will not be until
March.  

RIONet - String 3 is anticipated to move to the RIONet in March.  The TDF
firewall test with DSN on 02/22/06 was successful.  

Attitude Training - The FOT continues training on attitude determination,
maneuver planning, and maneuver execution.

============================================================================
Extra Activities:

None

============================================================================
Anomalies:

DOY 049 (02/18/06)  G06-0027  Pages not received by Honeywell-Tsi.com
Honeywell email was not delivering all of the automation pages.  
IMPACT:  Minimal.  All notifications were successfully received by
gsfc.nasa.gov, archwireless.net and skytel.com.  

DOY 049 (02/18/06)  G06-0028  Offline.gen Didn't Run
For unknown reasons, offline.gen did not run to archive and clean up the
pass files.  DR CDSID 21084
IMPACT:  History file acrhiving was not done until the following day.

DOY 050 (02/19/06)  G06-0029  ROBOTT/C&C Froze
After s_ops_plbk_complete finished, C&C froze for unknown reasons.  DR CDSID
21192
IMPACT:  The Real-time Monitor detected C&C froze and rebooted it 10 minutes
later.  

DOY 051 (02/19/06)  G06-0030  C&C Not Terminated Properly
When C&C froze (ref AR G06-0029), the RTMON did not terminate the C&C
processes completely before restarting a second instance of C&C.  C&C was
restart 4 times before the EOT.  DR CDSID 21329
IMPACT:  Command privileges were not added to any of the restarted instances
of C&C.  G_end_day and g_acedown did not run.

DOY 054 (02/23/06)  G04-0125  Data Server Connection lost (appended)
After EOT, Command & Control lost connection to the Data Server.  This is an
intermittent error.  A DR (CDSID #00021091) was submitted on 11/1/04 to
document the problem.  
IMPACT:  All commanding and data recovery had already completed for support.
Cause of error message continues to be unknown.