ACE Weekly 02/24/06 - 03/02/06

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

	Type         Attitude     Attitude
	Date         03/01/06     03/01/06
	DOY          060 2006     060 2006
	Thrusters    2R 4R+ 4R-   2R 4R+ 4R-
	Duration     4:57 min     6:29 min
	Start Time   17:14:09z    18:38:15z
	Stop Time    17:19:06z    18:44:44z
	Start HGA    5.30 deg     0.37 deg
	Stop HGA     0.37 deg     6.40 deg
	Firing       26 pulses    33 pulses

The next attitude maneuver is scheduled for Friday 03/10/06.

============================================================================
OCRs:

None

============================================================================
Ongoing Activities:

Space Link Extension (SLE) - The first version of ACE SLE was delivered to
the Library on December 14.  The delivery to the ACE MOC will not be until
after String 3 is converted to the RIONET.  

RIONet - String 3 is anticipated to move to the RIONet in March.    

Attitude Training - The FOT continues training on attitude determination,
maneuver planning, and maneuver execution.

============================================================================
Extra Activities:

None

============================================================================
Anomalies:

DOY 061 (03/02/06)  G04-0125  Data Server Connection lost (appended)
After EOT, Command & Control lost connection to the Data Server.  This is an
intermittent error.  A DR (CDSID #00021091) was submitted on 11/1/04 to
document the problem.  
IMPACT:  All commanding and data recovery had already completed for support.
Cause of error message continues to be unknown.