ACE Weekly 06/16/06 - 06/22/06

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

	Type          Attitude
	Date          06/16/2006
	DOY           167 2006
	Thrusters     2R 4R+ 4R-
	Duration      7:15 min
	Start Time    15:51:03z
	Stop Time     15:58:18z
	Start HGA     1.50 deg
	Stop HGA      6.20 deg
	Firing        37 pulses

The next attitude and station keeping #40 maneuvers are scheduled for
Monday, 06/26/06.

============================================================================
OCRs:

None

============================================================================
Ongoing Activities:

Attitude Training - The FOT continues training on attitude determination,
maneuver planning, and maneuver execution.  The transition date is
tentatively scheduled for 07/01/06.

RIONET - A licensing issue with the firewalls needs to be resolved before
the MOC can be transitioned.  

Space Link Extension (SLE) - ACE SLE version 2.1 was delivered to the
Library on April 28, 2006.  The delivery to the ACE MOC will not occur until
after String 3 is converted to the RIONET.

============================================================================
Extra Activities:

None

============================================================================
Anomalies:

DOY 168 (06/17/06)  G06-0065 - DSS66 - Antenna Stopped
DSS-66 antenna stopped and the station lost telemetry for 9 minutes.  When
telemetry came back online, RCVR B was out-of-lock.  DR M103742.  
IMPACT: All data was recovered.  No commanding to inactive CDH after
telemetry was back online, but necessary commands had already been sent.

DOY 172 (06/21/06)  G06-0066 - DSN SFG Alarms
There were problems with the SFG at JPL which cause telemetry dropouts in
the last 5 minutes of the pass.  DR N103750.  
IMPACT: None.  All pass activties were completed before the dropouts.