ACE Weekly 07/07/06 - 07/13/06

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

No attitude maneuvers were completed this week.  The next attitude maneuver
is scheduled for Friday, 07/14/06.

============================================================================
OCRs:

None

============================================================================
Ongoing Activities:

Attitude Training - The FOT continues training on attitude determination,
maneuver planning, and maneuver execution.  The transition date is
tentatively scheduled for 07/14/06.

RIONET - A licensing issue with the firewalls needs to be resolved before
the MOC can be transitioned.  

Space Link Extension (SLE) - ACE SLE version 2.1 was delivered to the
Library on April 28, 2006.  The delivery to the ACE MOC will not occur until
after String 3 is converted to the RIONET.

Multi-Mission MOC - The FOT has begun supporting the effort to determine the
feasibility of transferring to a multi-mission MOC.

============================================================================
Extra Activities:

DOY 191 (07/10/06) - Scrolled through all 30 telemetry section for SSR-A.
No new errors were detected on the SSR.

DOY 192 (07/11/06) - Scrolled through all 30 telemetry section for SSR-B.
No new errors were detected on the SSR.

============================================================================
Anomalies:

None