ACE Weekly 10/05/2007 - 10/11/2007

All ACE spacecraft subsystems are performing nominally.

Note:  Future ACE Weekly Reports will cover Wednesday to Tuesday (instead of
the current Friday to Thursday).

============================================================================
Orbit/Attitude:

	Type        Attitude
	Date        10/08/2007
	DOY         281 2007
	Thrusters   2R 4R+ 4R-
	Duration    13:31 min
	Start       15:59:55z
	Stop        16:13:26z
	HGAStart    -5.82deg
	HGAStop      7.60deg
	SunStart     7.83deg
	SunStop     11.19deg
	Nutation     0.31deg
	Firing      69 pulses
	FuelUsed      0.2261lbs
	FuelRemain  153.9972lbs
	FinalSCMass 1388.257lbs

The next attitude maneuver is scheduled for Monday, 10/29/2007.

============================================================================
OCRs:

None

============================================================================
Activities:

Space Link Extension (SLE) Testing status
DSN continues to troubleshoot 26m SLE problems.  The following tests have
been scheduled for testing both DSN and the ACE MOC SLE upgrade (v3.1)
	Day  Date   DOY  Station
	Thu  10/18  291  DSS-34
	Mon  10/22  295  DSS-66
	Wed  10/24  297  DSS-46
	Thu  10/25  298  DSS-34
	Thu  11/01  305  DSS-66 with DSS-27
	Thu  11/01  305  DSS-27

Multi-Mission Ops Center (MMOC)
The ACE team has started working with the ITOS developers to replace the
TPOCC mission software with ITOS.

============================================================================
Anomalies:

DOY 284  10/11/2007  S-ACE-0233  G07-0086  ROBOTT/C&C Froze
ROBOTT froze during the procedure S_OPS_PLBK_COMPLETE.  RTMON restart not
performed since less than 15 minutes before End of Track. CDSID#00021192
IMPACT:  This is a recurring issue that the ROBOTT developers are aware of.
Procedure G_ACEDOWN not performed.