ACE Weekly 11/21/2007 - 11/27/2007

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

	Type        Attitude
	Date        11/27/2007
	DOY         331 2007
	Thrusters   2R 4R+ 4R-
	Duration    9:58 min
	Start       13:48:15z
	Stop        13:58:13z
	HGAStart    -6.87deg
	HGAStop     +7.34deg
	SunStart    14.47deg
	SunStop      4.86deg
	Nutation     0.23deg
	Firing      51 pulses
	FuelUsed      0.1713lbs
	FuelRemain  153.3892lbs
	FinalSCMass 1387.649lbs

The next attitude maneuver is scheduled for Friday, 12/07/2007.

============================================================================
OCRs:

None

============================================================================
Activities:

ACE will start using F-CLTU SLE for operations on Friday 11/30/2007.  The
first pass is with DSS-66.


34m HEF S-Band Transmitter Testing Status
DSS-65 tests have been scheduled as follows

	Date       DOY  Station   Test
	Thu 11/29  333  DSS-65    Network SLE test
	Mon 12/03  337  DSS-65    S-Band XMTR, SLE and range data
	Wed 12/05  339  DSS-65    S-Band XMTR, SLE and range data

============================================================================
Anomalies:

None