ACE Weekly 07/02/2008 - 07/08/2008

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

	Type        Attitude
	Date        07/03/2008
	DOY         185 2008
	Thrusters   2R 4R+ 4R-
	Duration    14:39 min
	Start       16:43:23z
	Stop        16:58:02z
	HGAStart    -5.71deg
	HGAStop     +7.35deg
	SunStart     7.48deg
	SunStop      9.22deg
	Nutation     0.29deg
	Firing      75 pulses
	FuelUsed      0.2400lbs
	FuelRemain  149.0044lbs
	FinalSCMass 1383.264lbs

The next attitude maneuver is scheduled for Monday 07/14/2008.

===========================================================================
OCRs:

DOY 190 (07/08/2008)  GND-194  ROBOTT 1.0.4 Transition to Operations
Testing of ROBOTT 1.0.4 has been completed.  ROBOTT 1.0.4 will be installed
on string 1.  Operations will temporarily move to string 2 and start using
ROBOTT 1.0.4.  This patch removes the pass number check performed on the DSN
schedule.  DSN no longer uses the pass number and the field may be blank.

============================================================================
Activities:

There have been no updates on the JPL ISO router problem that resulted in
several lost ACE passes in May (DOY 124-126 and DOY 134).

============================================================================
Anomalies:

None