ACE Weekly 02/11/2009 - 02/17/2009

All ACE spacecraft subsystems are performing nominally.

============================================================================
Orbit/Attitude:

	Type        Attitude
	Date        02/16/2009
	DOY         047 2009
	Thrusters   2R 4R+ 4R-
	Duration    15:41 min
	Start       16:55:29z
	Stop        17:11:10z
	HGAStart    -7.82deg
	HGAStop     +7.22deg
	SunStart     6.00deg
	SunStop     15.22deg
	SpinStart   5.0071rpm
	SpinStop    5.0112rpm
	Nutation     0.17deg
	Firing      79 pulses
	FuelUsed      0.2548lbs
	FuelRemain  144.5708lbs
	FinalSCMass 1378.831lbs

The next attitude maneuver is scheduled for Wednesday 03/04/2009.

===========================================================================
OCRs:

None

============================================================================
Activities:

Data Capture:  100%  DOY 039-046 2009

An ACE Multi-Mission Ops Center (MMOC) test is scheduled for Friday
02/20/2009.  This will test DSN configuration changes that should allow VC1
(realtime) and VC2 (playback) data to be saved to separate CDR files after
the transition to SLE.

============================================================================
Anomalies:

None