ACE Weekly 05/13/2009 - 05/19/2009 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude Date 05/15/2009 DOY 135 2009 Thrusters 2R 4R+ 4R- Duration 15:14 min Start 14:35:08z Stop 14:50:22z HGAStart -7.34deg HGAStop +7.48deg SunStart 15.93deg SunStop 5.36deg SpinStart 5.0113rpm SpinStop 5.0164rpm Nutation 0.19deg Firing 77 pulses FuelUsed 0.2487lbs FuelRemain 143.2060lbs FinalSCMass 1377.466lbs The next attitude maneuver is scheduled for Tuesday 05/26/2009. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 130-137 2009 There was no pass on DOY 134. There was only 40.5 hours between the passes on DOY 133 & 135. Since the SSR capacity is 43 hours, an SSR failover was avoided and data capture remains 100%. ======================================================================== Anomalies: Update on AR#G09-0027 DSS-27 Red DSS-27 returned to service on Friday May 15. An ACE pass with DSS-27 was successfully completed on Sunday May 17. During the 3-week downtime, 14 of 22 ACE passes were with DSS-27 that needed to be rescheduled. There were 2 days without passes, however no data loss occurred during this time. Note, ACE playback is initiated via ground command (as opposed to spacecraft load). This gives ACE considerable flexibility in moving automated passes. DOY 133 05/13/2009 S-ACE-0437 G09-0032 DSS-46 Fire Alarm Ground station antenna experienced a fire alarm. Antenna was stowed (2323z) and the area was confirmed clear of fire. Telemetry and uplink restored by 2341z. DR#C106927 IMPACT: 18 minute outage. Refer to AR#G09-0033 for further impacts. DOY 133 05/13/2009 S-ACE-0438 G09-0033 ROBOTT Failure For unknown reasons, the ACE MOC automation software (ROBOTT) did not resume after a telemetry/command outage (AR#G09-0032). IMPACT: SSR redumps and final state-of-health checks were performed on the following pass. DOY 135 05/15/2009 S-ACE-0439 G09-0034 TAPS2 Data Capture Failure The trending software (TAPS) data capture daemon stopped receiving telemetry data on DOY 135 and was restarted on DOY 138. The data capture daemon occasionally fails when work on the network is being performed. This last occurred 03/05/2009. IMPACT: Minimal. The data was copied from TAPS1. DOY 135 05/15/2009 S-ACE-0441 G09-0036 AC3WS1 Power Supply Failure The power supply on ac3ws1 failed. Hardware maintenance replaced the power supply. IMPACT: Minimal. String 3 was not being used for operations. DOY 138 05/18/2009 S-ACE-0440 G09-0035 DSS-54 Network Problems Problems with the station's Enhanced Reliable Network Server (ERNS1) caused a telemetry outage (1631-1638z). DR#M105355 IMPACT: Minimal. 7 minute telemetry outage. SSR playback had already completed.