ACE Weekly 06/24/2009 - 06/30/2009

All ACE spacecraft subsystems are performing nominally.

========================================================================
Orbit/Attitude:

	Type        Attitude       SK-51
	Date        06/25/2009     06/25/2009
	DOY         176 2009       176 2009
	Thrusters   2R 4R+ 4R-     1A 2A
	Duration    10:51 min      38.683 sec
	Start       16:35:29z      18:22:55z
	Stop        16:46:20z      18:23:34z
	HGAStart    -3.12deg        7.35deg
	HGAStop      7.35deg        7.69deg
	SunStart     6.22deg       12.12deg
	SunStop     12.12deg       12.03deg
	SpinStart   5.0281rpm      5.0314rpm
	SpinStop    5.0314rpm      5.0190rpm
	Nutation     0.18deg        0.23deg
	Firing      55 pulses      Continuous
	FuelUsed      0.1823lbs     0.1391lbs
	FuelRemain  142.2848lbs   142.1457lbs
	FinalSCMass 1376.545lbs   1376.4059bs

The next attitude maneuver is scheduled for Tuesday 07/07/2009.

=======================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 172-179 2009


========================================================================
Anomalies:

None