ACE Weekly 11/04/2009 - 11/10/2009

All ACE spacecraft subsystems are performing nominally.

========================================================================
Orbit/Attitude:

No maneuvers were completed this week.  The next attitude maneuver is
scheduled for Thursday 11/12/2009.

=======================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 305-312 2009

DOY 313 11/09/2009 - Multi-Mission Operations Center (MMOC) Test
There were no problems receiving telemetry or sending commands with
DSS-34.  The spacecraft was commanded to high-rate and SSR data from the
previous pass was redumped.  The ITOS 803-2 software was installed for
the test.  The commandConversion feature successfully calculated the
spacecraft clock counter from UTC time (09-313-20:20:00) for the TimeTag
Bin Load.  The ITOS remote event database access was tested, but not
successful.  After the test, the configuration and password was changed
and the ITOS remove event database access is now working.

========================================================================
Anomalies:

None