ACE Weekly 12/02/2009 - 12/08/2009 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: No maneuvers were completed this week. The next attitude maneuver is scheduled for Thursday 12/10/2009. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 99.99% DOY 333-340 2009 31 second gap (2009-336 10:27:57-10:28:27) due to DSS-24 transmitter problems on DOY 335 ======================================================================== Anomalies: DOY 340 12/06/2009 S-ACE-0473 S09-0010 Increase in SBE_CT_B SSR B Single Bit Error Count (SBE_CT_B) increased from 6089 to 6839 since last checked on DOY 333 (11/29/2009). SBE_CT is tracked as a measure of SSR health. IMPACT: Minimal. Single Bit Errors are automatically corrected by the SSR. No non-correctable errors (Hard Single Bit Errors & Double Bit Errors) have occurred throughout the mission. SBE_CT_A SBE_CT_B 1999 15 2000 2001 2002 2003 270 286 2004 858 2005 2006 2118 2007 510 3238 2008 4533 2009 6839