ACE Weekly 02/10/2010 - 02/16/2010

All ACE spacecraft subsystems are performing nominally.

========================================================================
Orbit/Attitude:

No maneuvers were completed this week.  The next attitude maneuver and
SK-53 are scheduled for Thursday 02/18/2010.

=======================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 038-045 2010

Goddard Space Flight Center reopened on Friday 02/12/2010 (DOY 043)
after being closed for 6.5 days.  The only 2 activities that required
manual intervention during this time were 1) an attitude maneuver
performed on Tuesday 02/09/2010 and 2) review and sending attitude/orbit
reports to ASC and NOAA SWPC.


The start of operational testing in the MMOC is scheduled for Tuesday
02/23/2010 (DOY 054).  All passes starting with DOY 054 will be taken
from the MMOC.  If there are significant problems, operations would
switch back to the old MOC and DSN will be able to reload the
configuration tables for the next day's pass.  The Operations Readiness
Review (ORR) is scheduled for 03/31/2010.

========================================================================
Anomalies:

None