ACE Weekly 10/26/2010-11/01/2010 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude Date 10/28/2010 DOY 301 2010 Thrusters 2R 4R+ 4R- Duration 12:57 min Start 14:31:22z Stop 14:44:19z HGAStart -5.75deg HGAStop 7.72deg SunStart 15.72deg SunStop 5.57deg SpinStart 5.0582rpm SpinStop 5.0609rpm Nutation 0.11deg Firing 66 pulses FuelUsed 0.2099lbs FuelRemain 133.2360lbs FinalSCMass 1367.496lbs The next attitude maneuver is scheduled for Wednesday 11/03/2010. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 298-305 2010 ======================================================================== Anomalies: DOY 301 10/28/2010 S-ACE-0552 G10-0066 FOT brought ITOS down on MMOCTC3 in preparation for switch back to UPS 14. However, context file removed from terminal remotely logged in to mmocops1p, not on mmoctc3. ITOS error message received on mmocops1p. IMPACT: ITOS recycled. Automation procedures started, binds initialized and data forwarding enabled. ACE_PASS procedure halted to prevent automatic swap of SSRs. All data recovered during subsequent support. ============================================================== Jacqueline Maldonado Snell Advanced Composition Explorer Flight Operations Team Manager Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm W10B, Mailstop 428.2 Greenbelt, MD 20771 Phone: (301) 286-7072 Fax: (301) 286-1729 E-mail: Jacqueline.M.Snell@nasa.gov ------=_NextPart_000_0074_01CB7B73.19B048F0 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

 

ACE Weekly 10/26/2010-11/01/2010

 

 

All ACE spacecraft subsystems are performing = nominally.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Orbit/Attitude:

 

Type       = Attitude      

Date       = 10/28/2010    

DOY       &= nbsp; 301 2010      

Thrusters   = 2R 4R+ 4R-    

Duration    12:57 min     

Start       14:31:22z     

Stop       = 14:44:19z     

HGAStart    -5.75deg           = ;   

HGAStop      7.72deg           =   

SunStart    15.72deg      

SunStop      5.57deg      

SpinStart   5.0582rpm     

SpinStop    5.0609rpm     

Nutation     0.11deg      

Firing      66 pulses     

FuelUsed      0.2099lbs   

FuelRemain  133.2360lbs   

FinalSCMass 1367.496lbs   

 

The next attitude maneuver is scheduled for = Wednesday 11/03/2010.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D

OCRs:

 

None

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Activities:

 

Data Capture:  100%  DOY 298-305 = 2010

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Anomalies:

 

DOY 301  10/28/2010  S-ACE-0552  = G10-0066

FOT brought ITOS down on MMOCTC3 in preparation = for switch back to UPS 14. 

However, context file removed from terminal = remotely logged in to mmocops1p,

not on mmoctc3.  ITOS error message = received on mmocops1p. 

IMPACT:  ITOS recycled.  Automation = procedures started, binds initialized

and data forwarding enabled.  ACE_PASS = procedure halted to prevent automatic

swap of SSRs.  All data recovered during = subsequent support.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D<= /p>

Jacqueline Maldonado Snell

Advanced Composition Explorer Flight Operations Team = Manager

Honeywell Technology Solutions Incorporated (HTSI)

Goddard Space Flight Center

Bldg. 14 Rm W10B, Mailstop 428.2

Greenbelt, MD 20771

Phone: (301) 286-7072

Fax: (301) 286-1729

E-mail: Jacqueline.M.Snell@nasa.gov

 

------=_NextPart_000_0074_01CB7B73.19B048F0--