ACE Weekly 11/09/2010 - 11/15/2010 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude Date 11/10/2010 DOY 314 2010 Thrusters 2R 4R+ 4R- Duration 8:47 min Start 15:11:37z Stop 15:20:24z HGAStart -5.18deg HGAStop 7.74deg SunStart 9.98deg SunStop 5.25deg SpinStart 5.0632rpm SpinStop 5.0646rpm Nutation 0.05deg Firing 45 pulses FuelUsed 0.1480lbs FuelRemain 132.9704lbs FinalSCMass 1367.230lbs The next attitude maneuver is scheduled for Wednesday 11/17/2010. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 313-319 2010 ======================================================================== Anomalies: DOY 313 11/09/2010 S-ACE-0555 G10-0071 ITOS tm_controller ITOS was unable to process telemetry due to a "timeout reading from tm_controller". ITOS was restarted before beginning of track. (DR CDSID#00027515) IMPACT: Manual intervention required. No delay in activities. ============================================================== Jacqueline Maldonado Snell Advanced Composition Explorer Flight Operations Team Manager Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm W10B, Mailstop 428.2 Greenbelt, MD 20771 Phone: (301) 286-7072 Fax: (301) 286-1729 E-mail: Jacqueline.M.Snell@nasa.gov ------=_NextPart_000_0058_01CB859B.EE1B1B10 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable
ACE =
Weekly 11/09/2010-11/15/2010
All =
ACE spacecraft subsystems are performing nominally.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D
Orbit/Attitude:
Type =
Attitude
Date =
11/10/2010
DOY &=
nbsp; 314 2010
Thrusters 2R =
4R+ 4R-
Duration 8:47 =
min
Start =
15:11:37z
Stop =
15:20:24z
HGAStart =
-5.18deg  =
;
HGAStop =
7.74deg =
SunStart =
9.98deg
SunStop =
5.25deg
SpinStart =
5.0632rpm
SpinStop =
5.0646rpm
Nutation =
0.05deg
Firing 45 =
pulses
FuelUsed =
0.1480lbs
FuelRemain =
132.9704lbs
FinalSCMass 1367.230lbs =
The next attitude maneuver is scheduled for =
Wednesday 11/17/2010.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D
OCRs:
None
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D
Activities:
Data =
Capture: 100% DOY 313-319 2010
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D
Anomalies:
DOY =
313 11/09/2010 S-ACE-0555 G10-0071 ITOS =
tm_controller
ITOS was unable to =
process telemetry due to a "timeout reading from
tm_controller". ITOS was restarted =
before beginning of track. (DR
CDSID#00027515)
IMPACT: Manual intervention required. =
No delay in activities.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D
Jacqueline Maldonado =
Snell
Advanced Composition =
Explorer Flight Operations Team Manager
Honeywell Technology =
Solutions Incorporated (HTSI)
Goddard Space Flight =
Center
Bldg. 14 Rm W10B, =
Mailstop 428.2
Greenbelt, MD =
20771
Phone: (301) 286-7072 =
Fax: (301) 286-1729 =
E-mail: Jacqueline.M.Snell@nasa.gov=
a>