ACE Weekly 12/21/2010 - 12/27/2010

All ACE spacecraft subsystems are performing nominally.

========================================================================
Orbit/Attitude:


         Type        Attitude
         Date        12/23/2010
         DOY         357 2010
         Thrusters   2R 4R+ 4R-
         Duration    12:23 min
         Start       16:22:40z
         Stop        16:35:03z
         HGAStart    -4.94deg
         HGAStop     +7.50deg
         SunStart     6.33deg
         SunStop     16.89deg
         SpinStart   5.0656rpm
         SpinStop    5.0686rpm
         Nutation     0.17deg
         Firing      63 pulses
         FuelUsed      0.2010lbs
         FuelRemain  131.6116lbs
         FinalSCMass 1365.871lbs

The next attitude maneuver is scheduled for Wednesday 01/05/2011.

=======================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 353-360 2010

There is a higher than normal risk of data loss from October 2010
through February 2011.  If there are problems with the passes, it may
not be possible to acquire additional DSN time.

========================================================================
Anomalies:

Update on AR#G10-0082:  DSN DCD problems that caused prime and backup
DCD to switch resulted in data being unavailable on the DSN's FDS
website.  DSN manually imported the data and it is now available.  ACE
Science Center was not impacted by the DCD problem.  (DR#N106933 and
N106950)


DOY 355  12/21/2010  S-ACE-0568  G10-0083  DSS-65 Brief Telemetry Delay
While DSN/Madrid was replacing UPS batteries, a router was disconnected.
There were 5 brief (40 seconds) delays in telemetry from 1445z through
1517z. (DR#M106095)
IMPACT:  Minimal.  There were no gaps in the telemetry, only 5 brief
delays in the delivery of telemetry to the MOC.


DOY 358  12/24/2010  S-ACE-0569  G10-0084  Goldstone Power Glitch
DSN/Goldstone experienced a power glitch and DSS-27 stopped tracking at
1733z (BOT=1550z EOT=1920z).  DSN attempted several remote resets but
were unsuccessful.  Personnel did not arrive in time to resolve the
problem before the end of the ACE track. (DR#G110893)
IMPACT:  No telemetry, including NOAA Space Weather, for the remainder
of the pass (107 minutes).  SSR playback completed on the following
pass.  Manual intervention required for MMOC procedure cleanup.


DOY 360  12/26/2010  S-ACE-0570  G10-0085  ITOS tm_controller
Before Beginning Of Track, ITOS had problems connecting telemetry,
"timeout reading from tm_controller".  ITOS was stopped and restarted.
IMPACT:  Manual intervention required.




**************************************************************************