ACE Weekly 01/11/2011 - 01/17/2011 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: No maneuvers were completed this week. The next attitude maneuver is scheduled for Friday, 01/21/2011. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 010-017 2011 There is a higher than normal risk of data loss from October 2010 through February 2011. If there are problems with the passes, it may not be possible to acquire additional DSN time. Nominally there is one IDR file per channel (realtime and playback) per ACE support available for download on the DCD. However, since DOY 013 ACE's data has been split into ~7 IDR files per channel per support. ASC notified the ACE NOPE and S. Kurtik of this discrepancy. ======================================================================== Anomalies: DOY 011 01/11/2011 S-ACE-0577 G11-0005 ITOS tm_controller ITOS was unable to process telemetry due to a "timeout reading from tm_controller". ITOS was restarted before beginning of track. (DR CDSID#00027515) IMPACT: Manual intervention required. No delay in activities. DOY 013 01/13/2011 S-ACE-0578 G11-0006 Empty Clock Calibration Reports generated Invalid Clock Calibration Reports generated during automated post-pass activities. IMPACT: FOT manually re-generated 013, 014 and 015 Clock Calibration Reports. ITOS restarted on DOY 016 and no further problems with automated clock calibration report generation. ============================================================== Jacqueline Maldonado Snell Advanced Composition Explorer Flight Operations Team Manager Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm W10B, Mailstop 428.2 Greenbelt, MD 20771 Phone: (301) 286-7072 Fax: (301) 286-1729 E-mail: Jacqueline.M.Snell@nasa.gov ------=_NextPart_000_000C_01CBB713.5BA961C0 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable
ACE =
Weekly 01/11/2011 - 01/17/2011
All =
ACE spacecraft subsystems are performing nominally.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D
Orbit/Attitude:
No =
maneuvers were completed this week.
The next attitude maneuver is scheduled for Friday, =
01/21/2011.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D
OCRs:
None
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D
Activities:
Data =
Capture: 100% DOY 010-017 2011
There =
is a higher than normal risk of data loss from October =
2010
through February 2011. =
If there are problems with the passes, it may
not be possible to acquire additional DSN =
time.
Nominally there is one IDR file per channel =
(realtime and playback)
per ACE =
support available for download on the DCD. However, since =
DOY 013 ACE’s data has been =
split into ~7 IDR files per channel per
support. ASC notified the ACE NOPE and S. =
Kurtik of this discrepancy.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D
Anomalies:
DOY =
011 01/11/2011 S-ACE-0577 G11-0005 ITOS =
tm_controller
ITOS was unable to =
process telemetry due to a "timeout reading from
tm_controller". ITOS was restarted =
before beginning of track. (DR
CDSID#00027515)
IMPACT: Manual intervention required. =
No delay in activities.
DOY =
013 01/13/2011 S-ACE-0578 G11-0006 Empty Clock =
Calibration Reports generated
Invalid Clock Calibration Reports generated during =
automated post-pass activities.
IMPACT: FOT manually re-generated 013, 014 =
and 015 Clock Calibration Reports. ITOS
restarted on DOY 016 and no further problems with =
automated clock calibration report generation.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D
Jacqueline Maldonado =
Snell
Advanced Composition =
Explorer Flight Operations Team Manager
Honeywell Technology =
Solutions Incorporated (HTSI)
Goddard Space Flight =
Center
Bldg. 14 Rm W10B, =
Mailstop 428.2
Greenbelt, MD =
20771
Phone: (301) 286-7072 =
Fax: (301) 286-1729 =
E-mail: Jacqueline.M.Snell@nasa.gov=
a>