ACE Weekly 03/01/2011 - 03/07/2011

All ACE spacecraft subsystems are performing nominally.

========================================================================
Orbit/Attitude:

No maneuvers were completed this week.  The next attitude maneuver is
scheduled for Thursday 03/17/2011.

=======================================================================
OCRs:

None


========================================================================
Activities:

Data Capture:  100%  DOY 058-065 2011


========================================================================
Anomalies:

WIND anomalies reported when they would affect ACE.

DOY 060  03/01/2011  S-WIND-0413          ITOS tm_controller
Before Beginning Of Track, ITOS had problems connecting telemetry,
"timeout reading from tm_controller".  ITOS was not restarted before the
end of the WIND pass.  CDSID#00027515
IMPACT:  WIND automatic playback captured by DSN.  ITOS restarted before
the ACE pass.

DOY 061  03/02/2011  S-WIND-0413          ITOS tm_controller
Before Beginning Of Track, ITOS had problems connecting telemetry,
"timeout reading from tm_controller".  ITOS was stopped and restarted
and the WIND pass was taken successfully.  CDSID#00027515
IMPACT:  Manual intervention required.