ACE Weekly 06/28/2011 - 07/04/2011 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude SK-58 Date 06/30/2011 06/30/2011 DOY 181 2011 181 2011 Thrusters 2R 4R+ 4R- 1A 2A Duration 13:32 min 20.112 sec Start 16:03:02z 18:16:28z Stop 16:16:34z 18:16:48z HGAStart -6.23deg +7.43deg HGAStop +7.43deg +7.21deg SunStart 7.49deg 18.01deg SunStop 18.01deg 17.49deg SpinStart 5.0057rpm 5.0087rpm SpinStop 5.0087rpm 5.0030rpm Nutation 0.10deg 0.56deg Firing 68 pulses Continuous FuelUsed 0.2178lbs 0.0712lbs FuelRemain 127.9648lbs 127.8936lbs FinalSCMass 1362.225lbs 1362.154lbs The nutation from SK-58 is larger than usual. There have been 2 other station-keeping maneuvers with higher than usual nutation 04/02/2007 SK-43 1A 2A nutation=0.50deg 09/22/2008 SK-48 1A 2A nutation=0.67deg The next attitude maneuver is scheduled for Friday 07/15/2011. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 149-156 2011 The GRAIL mission is expected to launch 09/08/2011. ACE has reduced DSN antenna time during September. The current schedule has ACE losing ~10% data over 3 weeks in September. ======================================================================== Anomalies: DOY 180 06/29/2011 S-ACE-0618 G11-0045 DSS-54 Antenna Pointing The ground antenna experienced problems with Antenna Monitor and Control (AMC). DR#M106382 IMPACT: Activities delayed 21 minutes. No impact to NOAA Space Weather Prediction Center (SWPC) since the spacecraft remained in the Real-Time Solar Wind (RTSW) format and was tracked by the NOAA antennas. DOY 182 07/01/2011 S-ACE-0619 G11-0046 DSN DCD Problems Problems with DSN's Data Capture and Delivery (DCD) system delayed telemetry from reaching the MMOC for 55 minutes. Telemetry was intermittently delayed for the next 23 minutes. DR#M106391 IMPACT: Activities delayed 55 minutes and commanding took 23 minutes instead of 5 minutes due to intermittent telemetry. No impact to NOAA SWPC since the spacecraft was in RTSW during the 55 minute outage. DOY 184 07/03/2011 S-ACE-0620 G11-0047 DSN TLM SLE Provider DSN notified FOT that the MMOC had not initiated commanding. The FOT travelled to the MMOC and found that the MMOC SLE Software (MUS) was unable to connect to DSN TLM SLE Provider (ECONNREFUSED). DSN Data Control restarted the ACE processes on the DSN TLM SLE Provider and telemetry reached the MMOC. DR#N107463 IMPACT: Activities delayed 52 minutes. No impact to NOAA SWPC since the spacecraft was in RTSW during the 52 minutes.