ACE Weekly 12/06/2011 - 12/12/2011

All ACE spacecraft subsystems are performing as expected.

========================================================================
Orbit/Attitude:

	Type         Attitude        SK-59
	Date        12/15/2011     12/15/2011
	DOY         349 2011       349 2011
	Thrusters   2R 4R+ 4R-     1A 2A
	Duration    16:10 min      41.574 sec
	Start       17:52:59z      19:11:05z
	Stop        18:09:09z      19:11:47z
	HGAStart    -8.22deg        +7.39deg
	HGAStop     +7.39deg        +7.38deg
	SunStart     6.57deg       17.59deg
	SunStop     17.59deg       17.40deg
	SpinStart   5.0456rpm      5.0504rpm
	SpinStop    5.0504rpm      5.0375rpm
	Nutation     0.16deg        0.39deg
	Firing      82 pulses      Continuous
	FuelUsed      0.2565lbs      0.1460lbs
	FuelRemain  124.8644lbs    124.7180lbs
	FinalSCMass 1359.124lbs    1358.980lbs

The next attitude maneuver is scheduled for Thursday 12/15/2011.

=======================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 345-352 2011

The ACE passes in the upcoming week (12/20/2011 through 12/29/2011)
average 2.6 hours per day.  The GRAIL mission is performing their Lunar
Orbit Insertion and their antenna view time is the same as ACE's.  ACE
is allocated 3.5 hours per day but can squeak by with 2.75 hours per
day.  The SSR playback will fall behind by ~10 hours over this period,
but no data loss is expected.  Data capture should be caught up during
the long pass scheduled for 12/30/2011.

========================================================================
Anomalies:

None