ACE Weekly 07/24/2013 - 07/30/2013

All ACE spacecraft subsystems are performing as expected.

========================================================================
Orbit/Attitude:

	Type         Attitude
	Date         07/30/2013
	DOY          211 2013
	Thrusters    2R 4R+ 4R-
	Duration     5:10 min
	Start        16:42:11z
	Stop         16:57:21z
	HGAStart     -8.88 deg
	HGAStop      +9.01 deg
	SunStart     11.00 deg
	SunStop      9.37 deg
	SpinStart    4.9457 rpm
	SpinStop     4.9468 rpm
	Nutation      0.19 deg
	Firing       26 pulses
	FuelUsed       0.0884 lbm
	FuelRemain   112.9444 lbm
	FinalSCMass  1347.204 lbm

The next attitude maneuver is scheduled for Tuesday 08/06/2013.

========================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 204-209 2013

Analysis of the third Santiago ranging/uplink test (7/18/2013) found
that the ranging had drifted throughout the test.  Santiago believes
that disabling "Doppler Rate Aid" may fix the problem.  No additional
tests have been scheduled yet.

========================================================================
Anomalies:

None