ACE Weekly 09/18/2013 - 09/24/2013

All ACE spacecraft subsystems are performing as expected.

========================================================================
Orbit/Attitude:

	Type         Attitude          SK-67
	Date         09/23/2013      09/23/2013
	DOY          266 2013        266 2013
	Thrusters    2R 4R+ 4R-      3A 4A
	Duration     8:32 min        31.843 seconds
	Start        13:59:30z       15:29:04
	Stop         14:08:02z       15:29:36
	HGAStart     -8.25 deg       +8.87 deg
	HGAStop      +8.87 deg       +8.85 deg
	SunStart     16.87 deg       12.56 deg
	SunStop      12.56 deg       12.56 deg
	SpinStart    4.9594 rpm      4.9611 rpm
	SpinStop     4.9611 rpm      4.9537 rpm
	Nutation      0.09 deg        0.06 deg
	Firing       43 pulses       continuous
	FuelUsed       0.1390 lbm      0.1041 lbm
	FuelRemain   111.8432 lbm    111.7391 lbm
	FinalSCMass  1346.103 lbm    1345.999 lbm

The next attitude maneuver is scheduled for Tuesday 10/01/2013.

========================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 258-265 2013

Monthly WS1 pass was performed 9/18/2013.  The pass was cut short so
that the NOAA antenna in Boulder, CO could test new receivers which
required the spacecraft to be in the low data rate.


========================================================================
Anomalies:

None