ACE Weekly 10/02/2013 - 10/08/2013

All ACE spacecraft subsystems are performing as expected.

========================================================================
Orbit/Attitude:

	Type         Attitude
	Date         10/08/2013
	DOY          281 2013
	Thrusters    2R 4R+ 4R-
	Duration      9:32 min
	Start        14:36:29z
	Stop         14:46:01z
	HGAStart     -8.10 deg
	HGAStop      +8.83 deg
	SunStart     13.81 deg
	SunStop      11.85 deg
	SpinStart    4.9559 rpm
	SpinStop     4.9580 rpm
	Nutation      0.17 deg
	Firing       48 pulses
	FuelUsed       0.1536 lbm
	FuelRemain   111.4260 lbm
	FinalSCMass  1345.686 lbm

The next attitude maneuver is scheduled for Tuesday 10/15/2013.

========================================================================
OCRs:

DOY 282 (10/09/2013) 1521-1622z  SIS-056  2 cmds
Disable noisy matrix detector strip (M1B HV #2) following the 9/30/2013 
SEP event. M1B HV strip#2 had been re-enabled on 01/22/2013 (SIS-054).

========================================================================
Activities:

Data Capture:  100%  DOY 273-280 2013

As expected, the ULEIS shutter closed during recent solar storm
     Tue Oct 1 DOY 274 19:27:29  closed to  25%
     Wed Oct 2 DOY 275 00:34:41  closed to   6%
     Thu Oct 3 DOY 276 01:51:29  opened to  25%
     Thu Oct 3 DOY 276 20:08:01  opened to 100% 

========================================================================
Anomalies:

None