ACE Weekly 07/09/2014 - 07/15/2014 All ACE spacecraft subsystems are performing as expected. ======================================================================== Orbit/Attitude: Type Attitude Date 07/15/2014 DOY 196 2014 Thrusters 2R 4R+ 4R- Duration 4:56 min Start 15:27:13z Stop 15:32:09z ra,decStart 114.07,36.67 ra,decStop 118.89,35.15 ra,decExpect 119.48,34.81 Deviation 0.59 deg HGAStart -10.92 deg HGAStop +10.97 deg SunStart 15.22 deg SunStop 14.17 deg SpinStart 4.9880 rpm SpinStop 4.9894 rpm Nutation 0.12 deg Firing 25 pulses FuelUsed 0.0842 lbm FuelRemain 105.6612 lbm FinalSCMass 1339.921 lbm The next attitude maneuver is scheduled for 07/21/2014 (Monday instead of the usual Tuesday). This week's attitude maneuver was short by 0.59 degrees. The investigation into the maneuvers not reaching the target continues. Date Actual ra,dec Expected ra,dec deviation (degrees) 04/01/2014 18.95 -5.15 19.18 -5.06 0.25 04/08/2014 27.53 -0.69 27.76 -0.74 0.24 04/15/2014 36.18 2.70 36.37 2.52 0.26 04/22/2014 44.93 5.96 45.12 5.83 0.23 04/29/2014 54.60 12.03 54.87 11.87 0.31 05/06/2014 60.45 26.36 60.85 27.05 0.78 (>0.5) 05/13/2014 63.39 32.25 63.78 33.05 0.86 (>0.5) 05/20/2014 69.49 35.51 70.20 35.72 0.61 (>0.5) 05/27/2014 76.45 37.45 76.99 37.51 0.43 06/03/2014 82.17 39.11 82.40 39.11 0.18 06/10/2014 91.99 38.97 91.84 39.06 0.15 06/17/2014 95.60 39.71 95.96 39.70 0.28 06/24/2014 101.96 39.24 102.16 39.13 0.19 07/01/2014 108.48 38.10 108.74 37.98 0.24 07/08/2014 114.35 36.62 114.77 36.37 0.42 07/15/2014 118.89 35.15 119.48 34.81 0.59 (>0.5) ======================================================================== OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 187-194 2014 ======================================================================== Anomalies: DOY 195 07/14/2014 S-ACE-0684 G14-0011 DSS-65 Earth Receive Time DSS-65 (Madrid) Earth Receive Time (ERT) fell behind by 1 second at 15:30:44z and recovered (+0.999 sec) at 15:38:16z. IMPACT: The clock calibration for DOY 195 had a ~0.05 second deviation which is negligible. Difference between DOY 195 problem and previous ERT problems: The previously recurring ERT problems were due to a software upgrade (RRT v11.3.6 AR 118839) at Goldstone. When a data-rate change occurred, the ERT would be behind by 1 or more high-rate frames (1 frame every 0.091 seconds). The DOY 195 ERT problem occurred in the middle of the DSN pass and the ERT was off by a whole second. The previously recurring ERT problems had a smaller shift (0.091, 0.182 or 0.273 seconds) compared to the DOY 195 problem (1 second). But since the previously recurring ERT problem usually occurred for the whole pass (~3 hours), it had a bigger impact than the DOY 195 problem which only occurred for 7.5 minutes.