ACE Weekly 09/24/2014 - 09/30/2014 All ACE spacecraft subsystems are performing as expected. ======================================================================== Orbit/Attitude: Type Attitude Date 09/30/2014 DOY 273 2014 Thrusters 2R 4R+ 4R- Duration 10:52 min Start 15:15:15z Stop 15:26:07z ra,decStart 176.28,-14.27 ra,decStop 185.99,-18.28 ra,decExpect 186.46,-18.45 Deviation 0.48 deg (-4% short) HGAStart -9.76 deg HGAStop +10.73 deg SunStart 15.37 deg SunStop 15.49 deg SpinStart 4.9896 rpm SpinStop 4.9925 rpm Nutation 0.22 deg Firing 55 pulses FuelUsed 0.1715 lbm FuelRemain 103.7484 lbm FinalSCMass 1338.008 lbm The next attitude maneuver is scheduled for Tuesday 10/07/2014. ======================================================================== OCRs: None ======================================================================== Activities: Data Capture: 99.98% DOY 264-271 2014 DOY 269 04:52:57-04:54:10 74 seconds DOY 271 07:47:53-07:48:59 67 seconds DOY 271 09:54:49-09:55:19 31 seconds There were 172 seconds of data loss due to SSR B being stuck in playback, a SSR failover and no redumps performed when we are behind in the SSR playback. ======================================================================== Anomalies: DOY 269 09/26/2014 S-ACE-0689 ACE_PASS procedure stuck waiting for command verification Nominal end of pass activities were not completed during the support due to an ITOS command graph error which interrupted procedure execution. When the SSR playback is longer than the pass, the SSR is commanded to idle before switching to the low-rate (RTSW) data format. SSR B was still in playback when the downlink format automatically changed to RTSW @ EOT. IMPACT: The ground procedures are designed to handle this contingency. However, 172 seconds of data was lost because SSR stuck in playback, SSR failover occurred and redumps are not performed when the playback is behind. =========================================== Jacqueline Maldonado Snell WIND, Geotail and ACE Flight Operations Team Manager Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm N284, Mailstop 428.2 Greenbelt, MD 20771 Office: 301-286-7072 Cell: 443-896-8868 Fax: 301-286-8257 Email: Jacqueline.M.Snell@nasa.gov