ACE Weekly 12/10/2014 - 12/16/2014

ACE spacecraft subsystems are performing as expected.

========================================================================
Orbit/Attitude:

	Type           Attitude
	Date          12/16/2014
	DOY            350 2014
	Thrusters      2R 4R+ 4R-
	Duration        6:20 min
	Start          20:59:27z
	Stop           21:05:47z
	ra,decStart   265.49,-9.01
	ra,decStop    271.47,-9.13
	ra,decExpect  271.65,-9.18
	Deviation       0.18 deg (-3% short)
	HGAStart       -8.91 deg
	HGAStop        +8.99 deg
	SunStart       14.44 deg
	SunStop       15.90 deg
	SpinStart     4.9921 rpm
	SpinStop      4.9934 rpm
	Nutation        0.18 deg
	Firing         32 pulses
	FuelUsed        0.1044 lbm
	FuelRemain    101.9732 lbm
	FinalSCMass   1336.233 lbm

The next attitude maneuver is scheduled for Tuesday 12/23/2014.

========================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 341-348 2014

DSN antenna time is limited in the first half of January.  The WS1
antenna will be scheduled to fill gaps.

NOAA SWPC had a planned power outage on 12/13/2014 1100-0000z.  ACE
operations at GSFC was unaffected.

========================================================================
Anomalies:

None