ACE Weekly 12/31/2014 - 01/06/2015

ACE spacecraft subsystems are performing as expected.

========================================================================
Orbit/Attitude:

	Type           Attitude
	Date          01/06/2015
	DOY            006 2015
	Thrusters      2R 4R+ 4R-
	Duration        5:31 min
	Start          12:45:54z
	Stop           12:51:25z
	ra,decStart   281.91,-9.48
	ra,decStop    287.05,-9.87
	ra,decExpect  287.25,-9.95
	Deviation       0.21 deg (-4% short)
	HGAStart       -8.68 deg
	HGAStop        +9.00 deg
	SunStart       13.98 deg
	SunStop        12.71 deg
	SpinStart     4.9953 rpm
	SpinStop      4.9964 rpm
	Nutation        0.19 deg
	Firing         28 pulses
	FuelUsed        0.0925 lbm
	FuelRemain    101.6836 lbm
	FinalSCMass   1335.943 lbm

The next attitude maneuver is scheduled for Tuesday 01/13/2014.

========================================================================
OCRs:

None

========================================================================
Activities:

Data Capture:  100%  DOY 362-004 2015

Two WS1 passes are scheduled for the upcoming week (1/8/2015 &
1/10/2015).

========================================================================
Anomalies:

DOY 001 01/01/2015   S-ACE-0647  G12-0009  DSN TLM SLE Provider
The MMOC SLE Software (MUS) was unable to connect to DSN TLM SLE
Provider (ECONNREFUSED) for 36 minutes until 2041z.  DSN reports that
the SLE "service- instance- stop-time" parameter had expired
(DR#N109828).  The last time the MMOC could not connect to the DSN TLM
SLE provider was on 02/09/2013.
IMPACT:  Activities delayed 36 minutes.  No impact to NOAA SWPC since
the spacecraft was in RTSW during this time.