ACE Weekly 01/13/2016 - 01/19/2016

All ACE spacecraft subsystems are performing as expected.

========================================================================
Attitude/Orbit:


Type               Attitude                    SK-78
Date             01/19/2016               01/19/2016
DOY                019 2016                 019 2016
Thrusters        2R 4R+ 4R-                    3A 4A
Duration       8:36 minutes               40 seconds
Start             17:00:12z                18:10:16z
Stop              17:08:48z                18:10:56z
ra,decStart   282.45,-18.10            290.65,-19.63
ra,decStop    290.65,-19.63            290.66,-19.62
ra,decExpect  290.87,-19.73            290.65,-19.63
Deviation          0.22 deg (-2.7%)       0.162 cm/s (+0.840%)
HGAStart          -8.21 deg                -0.33 deg
HGAStop           -0.33 deg                -0.36 deg
SunStart          17.71 deg                 9.83 deg
SunStop            9.83 deg                 9.87 deg
SpinStart        5.0492 rpm               5.0516 rpm
SpinStop         5.0516 rpm               5.0424 rpm
Nutation           0.16 deg                 0.10 deg
Firing            44 pulses               Continuous
FuelUsed         0.1349 lbm               0.1277 lbm
FuelRemain      93.4076 lbm              93.2799 lbm
FinalSCMass    1327.668 lbm             1327.540 lbm


Upcoming Maneuver Schedule:

- Attitude maneuver:     		Monday, 01/25/2016

========================================================================
OCRs:

None


========================================================================
Activities:

Data Capture: 100%  2016 DOY 010 - 2016 DOY 017

========================================================================

Anomalies:

- 01/13/2016 - SOAR S-ACE-91 - Network problem affecting ACE_DATA_FWD and
Email notification delay.

Network problems at the start of the D-15 pass on DOY 13 became apparent,
causing early connection attempts to NOAA and Caltech to fail. The
connections were successful during the 15:43 - 15:47 (UT) time window. In
addition, a delay in notification emails was observed, which persisted
throughout the day. Note that there was no scheduled network maintenance
work during the D-15 contact time.

Impact:

Minimal - Delay of automated operations-related notification emails.  NOAA
and Caltech did not received forwarded data during the outage (from
approximately 15:20 UT through 15:47 UT).


- 01/13/2016 - SOAR S-ACE-92 - DSN MDS1 (Monitor Data Server) Failure (DR#
G116882)

Loss of monitor and ranging data due to a DSN MDS1 (Monitor Data
Server) failure. DSN reported downtime from 16:57 to 18:11 UT (74 minutes
total;  Ref: DSN DR# G116882). As a result of this failure, a problem on
the SLE command connection occurred at 17:07 (UT).  The SLE connection was
restored at 17:51 (UT), as verified at the MMOC.

Impact:

Minimal - No DSN monitor data available to the FOT during the
16:57 (UT) �� 18:11 (UT) time frame, and no commanding/forward link
during the 17:07 (UT ) - 17:51 (UT) time window (but ultimately, with no
impact to achieving the planned contact commanding goals).