ACE Weekly 04/20/2016 - 04/26/2016

All ACE spacecraft subsystems are performing as expected.

========================================================================

Attitude/Orbit:

Type               Attitude
Date             04/26/2016
DOY                117 2016
Thrusters        2R 4R+ 4R-
Duration       4:55 minutes
Start             16:45:37z
Stop              16:50:32z
ra,decStart    46.57,+12.16
ra,decStop     50.94,+11.90
ra,decExpect   51.13,+11.79
Deviation          0.19 deg (-4.3%)
HGAStart          +5.62 deg
HGAStop           +8.83 deg
SunStart          12.15 deg
SunStop           16.37 deg
SpinStart        5.0689 rpm
SpinStop         5.0701 rpm
Nutation           0.08 deg
Firing            25 pulses
FuelUsed         0.0799 lbm
FuelRemain       91.083 lbm
FinalSCMass    1325.343 lbm

Note: 

- The maneuver was short in magnitude (25 pulses).  The observed
  deviation is in-family with previous attitude maneuver performance
  (post closing the Tank-B latch valves) and the relatively large
  cold percentage is simply due to the small maneuver burn size.

Upcoming Maneuver Schedule:

- Attitude Maneuver:     Tuesday, 05/03/2016

========================================================================
OCRs:

None

========================================================================
Activities:

Data Capture: 100%  2016 DOY 108 - 2016 DOY 115

========================================================================

Anomalies:

None