ACE Weekly 01/11/2017 - 01/17/2017 All ACE spacecraft subsystems are performing as expected. =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Attitude/Orbit: Type Attitude Date 1/17/2017 DOY 017 2017 Thrusters 2R 4R+ 4R- Duration 9:11 minutes Start 18:47:03z Stop 18:56:14z ra,decStart 280.94,-18.32 ra,decStop 289.64,-19.64 ra,decExpect 289.93,-19.77 Deviation 0.29 deg (-3.3%) HGAStart -7.93 deg HGAStop +0.83 deg SunStart 17.92 deg SunStop 9.64 deg SpinStart 4.9507 rpm SpinStop 4.9529 rpm Nutation 0.14 deg Firing 46 pulses FuelUsed 0.1388 lbm FuelRemain 85.904 lbm FinalSCMass 1320.164 lbm Upcoming Maneuver Schedule: - Attitude Maneuver: Tuesday, 11/24/2017 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D OCRs: None =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Activities: Data Capture: 100% DOY 009-015 2017 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Anomalies: Update 01/06/2017 DOY 006 S-ACE-101 FOT account unable to download schedul= e from SPS The issue with the MMOC's group account log-in to JPL/DSN's SPS Server has = been resolved. Automated log-in and download of the DSN schedules was resumed on 01/17/201= 7. =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Jacqueline Maldonado Snell Wind, Geotail and ACE Flight Operations Team Manager Goddard Space Flight Center, Bldg 14 Room N284, Mailstop 428.2 | Greenbel= t, MD 20771 | USA Office: +1 301.286.7072 | Mobile: +1 443.896.8868 | jacqueline.m.snell@= nasa.gov --_000_78235E3560DF5348866CB22962C81DE811722517NDMSMBX402ndcna_ Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable
ACE Weekly 01/11/2017 – 01/17/2017
 
All ACE spacecraft subsystems are performing as expected.
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
 
Attitude/Orbit:
 
Type           =     Attitude
Date           =    1/17/2017
DOY           &= nbsp;    017 2017
Thrusters        2R 4R+ 4R-
Duration       9:11 minutes
Start           = ;  18:47:03z
Stop           =    18:56:14z
ra,decStart   280.94,-18.32
ra,decStop    289.64,-19.64
ra,decExpect  289.93,-19.77
Deviation          0.29 d= eg (-3.3%)
HGAStart          -7.93 d= eg
HGAStop           &#= 43;0.83 deg
SunStart          17.92 d= eg
SunStop          &nb= sp; 9.64 deg
SpinStart        4.9507 rpm
SpinStop         4.9529 rpm
Nutation           0= .14 deg
Firing          &nbs= p; 46 pulses
FuelUsed         0.1388 lbm
FuelRemain       85.904 lbm
FinalSCMass    1320.164 lbm
 
Upcoming Maneuver Schedule:
- Attitude Maneuver:        &n= bsp;           Tuesday,&n= bsp;  11/24/2017
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
OCRs:
 
None
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Activities:
 
Data Capture: 100%  DOY 009-015 2017
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
 
Anomalies:  
 
Update 01/06/2017 DOY 006 S-ACE-101  FOT account unable to downlo= ad schedule from SPS
The issue with the MMOC’s group account log-in to JPL/DSN’= s SPS Server has been resolved. 
Automated log-in and download of the DSN schedules was resumed on 01/1= 7/2017.
 
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
 
Jacqueline Maldonado Snell
 
Wind, Geotail and ACE Flight Operations Team Manager
Goddard Space Flight Center, Bldg 14 Room N284, Mailstop 428.2&n= bsp; |  Greenbelt, MD 20771  |  USA
Office: +1 301.286.7072  |  Mobile: +1 443.896= .8868  |  jacqueline.m.snell@nasa.gov
 
 
 
 
--_000_78235E3560DF5348866CB22962C81DE811722517NDMSMBX402ndcna_--